background image

MFT70 

M

egger 

.. 

Quick Start Guide 

MEASURING VOLTAGE 

3  Press either 

lim 

button

Lh 

When connecting to a live circuit,

the voltage and frequency of 

supply is automatically displayed. 

TEST THE PAIR FOR ALTERNATING CURRENT AND DIRECT CURRENT VOLTAGE 

.. 

l

� 

For all 3  setup  configurations: 

Ac 

< 10 = Proceed to the next test 

Ac"?. 

10 = Fault must be cleared 

Dc 

< 3 = Proceed to the next test 

Dc 

"?. 

3 = Fault must be cleared 

TIP to RING 

MEASURING CONTINUITY 

&pressDm 

2

button 

RING to GROUND 

MEASURING INSULATION RESISTANCE 

Test button 

Lead Null 

Mode 

Test lock 

D

i

sp

l

ay 

Setup se

l

ector  backl

i

ght 

Results store 

Ring 

Tip 

Primary 

f

unct

i

ons 

TRUE RMS 

... 

TIP to GROUND 

click the mode 

button to togggle 

the continuity 

buzzer ON/OFF 

3  Press and hold 

•jfjl 

button

To lock the test, hold down either TEST button, followed 

by either of the 

RED 

lock buttons below. 

There's a S00VDC MAX Insulation Resistance Voltage Testing 

as per Telecom Standards! The field pair must be OPEN at 

end of loop to properly conduct an insulation resistance test. 

Secondary 

Test button 

To store your test results: 

funct

i

ons 

Lead Null 

1. Press lock & release

2. Using the right test/lock buttons,

scrol I unti I the test you need is

reached.

3. Press lock & release again to dis-

play the remaining options & use

the right buttons (above) to scroll

again.

4. Press lock & hold until 'Str Ok' is

displayed.

Touch vo

l

tage 

Test lock 

contact point 

Setup se

l

ector 

5 Commonwealth Ave

Woburn, MA 01801

Phone 781-665-1400 Toll

Free 1-800-517-8431

Visit us at www.T

estEquipmentDepot.com

Reviews: