Medicatlantic XXL User Manual Download Page 1

2015_10_15 

                                 580040 Anglais 

 
 

 
 

4 Le Pas du Château 

85670 SAINT PAUL MONT PENIT 

TEL : 02-51-98-55-64 

FAX : 02-51-98-59-07 

Email : 

[email protected]

 

Site Internet : http://www.winncare.fr 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 

 
 
 
 
 
 

IXX3L08/11-120/140 

IXL4L08/11-120/140 

 

X

X

X

X

L

L

 

 

D

D

I

I

V

V

I

I

S

S

Y

Y

S

S

 

 

X

X

X

X

L

L

 

 

X

X

P

P

R

R

E

E

S

S

S

S

 

 

Summary of Contents for XXL

Page 1: ...u Château 85670 SAINT PAUL MONT PENIT TEL 02 51 98 55 64 FAX 02 51 98 59 07 Email info medicatlantic fr Site Internet http www winncare fr IXX3L08 11 120 140 IXL4L08 11 120 140 X XX XL L D DI IV VI IS SY YS S X XX XL L X XP PR RE ES SS S ...

Page 2: ...r the back rest Cardio Pulmonary Resuscitation 13 4 MAINTENANCE 14 4 1 Instructions for dismantling the motors 14 4 2 Maintenance 14 4 3 Cleaning and disinfection 17 4 4 Warranties 19 4 5 Identification 19 5 CONDITIONS FOR SCRAPPING 19 6 ASSEMBLING AND DISMANTLING 20 6 1 Assembling the bed XXL XPress 20 6 2 Assembling the bed XXL XPress 24 6 3 Dismantling the bed XXL and XXL XPress 25 6 4 Fold the...

Page 3: ...TRANSPORT AND STORAGE For transport the bed should be in its low position on a pallet and strapped and protected The wired control and supply lead should be attached to the bed base The head and footboards are protected and strapped to the sleeping surface The bed should be transported upright when in its original packaging in compliance with the instructions printed on the packaging 2 BED ENVIRON...

Page 4: ...st if this is not flat In the case of a prolonged more than 50 tilt bust semi sitting position it is recommended to vary the position of the person in bed every 2 hours When the bed is being moved keep the power lead well away from the ground and wheels When use of an adaptor extension lead or connection plug proves necessary you must check that its characteristics are suitable for the bed Connect...

Page 5: ...ted to the bed s normal purpose such as use of the bed by several people at the same time use outdoors moving the bed on a slope that is steeper than 10 etc 3 2 First use Remove the packaging protective devices adhesive tape packing straps and holding clamps see unpacking instructions on the pallet Put the bed in the designated room foreseeing an appropriate perimeter of use for the different func...

Page 6: ...XX3L07 08 11 MEDICATLANTIC 2015_10_15 6 32 Assemble the highest board on the head side 3 3 Use 3 3 1 Easy Move boards Installing an Easy Move bed board Removing an Easy Move bed board 1 to 2 cm 1 1 to 2 cm 2 3 ...

Page 7: ... using the release pin There must be at least 220 mm between the top of the side rail and uncompressed mattress surface 3 3 2 Metal side rails To positionning the side rail 1 2 1 Insert amount of the side rail in the grip jaw on the head side of the bed 2 Tighten the Rondo screws of the grip jaws on the bed base To remove the side rail in reverse operation 2 and operation 1 by pulling the release ...

Page 8: ...the top side rail with both hands until it locks Check that it is properly slot in To lower the side rail Raise the top side rail with one hand Press on the unlocking button with the other hand Support the rail as it lowers Repeat steps to for the other side 3 3 4 Angled lifting pole and IV stand The lifting pole is intended to help the patient lift him herself up and change position in the bed It...

Page 9: ...the wheels are locked by trying to move the bed If this is not done the patient or another person who leans on the bed may fall 3 3 6 Remote control Carry out a test cycle when the bed is empty to familiarise yourself with the bed functions Lifting and lowering of back rest Lifting and lowering of variable height Lifting and lowering of electric folding Simultaneous lifting and lowering of back re...

Page 10: ...t with the bed base 3 4 Technical characteristics 3 4 1 Electrical data TYPE PROTECTION INDEX VOLTAGE FREQUENCY LINAK jack LA27 LA24 LA34 IP 66 24V DC Supply box CB6 CB16 IP 66 230 V AC 50 HZ Connection box MJB IP 66 24V DC Operator s side control console ACC IP 66 24V DC Operator s mobile control console ACO IP 66 24V DC Wired control HB72 HB74 IP 66 24V DC Lockable wired control HL72 HL74 IP 54 ...

Page 11: ...f the main power supply must be the same as for a typical commercial or hospital environment Surges EN 61000 4 5 Differential mode 1 kV Common mode 2 kV Differential mode 1 kV The quality of the main power supply must be the same as for a typical commercial or hospital environment Voltage dips short interruptions and voltage variations EN 61000 4 11 5 UT for 10 ms 40 UT for 100 ms 70 UT for 500 ms...

Page 12: ...uipment and the medical bed see references in contents The medical bed see references in contents is intended for use in the electromagnetic environment in which radiated RF disturbances are controlled The user of the bed can help prevent electromagnetic interference by maintaining a minimum distance between portable and mobile RF communications equipment transmitters and the bed as recommended be...

Page 13: ...a Disconnect the power supply b Dismantle the headboard c Stand at the head of the bed and take hold of the back rest handle with one hand Push or lift to compensate the pressure exerted by the patient and unhook the clip by the connecting rod with the other hand The back rest jack will then pivot downwards d Put the headboard back Version with handle on the back rest Version without handle on the...

Page 14: ...d out in accordance with our specifications and at least once a year by the organisation or person who installed the bed Between two maintenance sessions and at least once a year the following should be carried out Verification that the electrical leads are connected all along the metal jambs to prevent shearing of these leads when the variable height is being activated Verification that all of th...

Page 15: ...tops General cleanliness Acceptable state of corrosion given the requirements of the user department Identification label serigraphy in good condition Mechanical condition Lifting pole in good condition positioning and strap Mechanical leads in good condition Sleeping surface in good condition bed base Boards lock and tighten well head and footboards Chest rest functions properly Leg rest function...

Page 16: ... barrier to the uncompressed mattress surface excluding therapeutic mattresses is more than or equal to 220 mm complies with the standard in force 2 Safety check NA 1 YES NO Locking of operational functions Inactivation of variable height control pedals Check that the headboard extracts or retracts properly in an emergency Cardio Pulmonary Resuscitation CPR emergency flattening of the back rest Ch...

Page 17: ...h pressure cleaning is forbidden Unplug the mains lead Check that all the electrical parts are connected together All the sockets of the supply box must be used otherwise its watertightness is not guaranteed Clean the electric covers of the jacks and wired control straightaway if any bodily fluids particularly urine have sprayed on to them The medical bed is a non critical appliance requiring Low ...

Page 18: ... Bio cleaning operation or o Steam cleaning accessory with microfiber band of the flat surfaces and the base slats Change the washing mops regularly to prevent water accumulating Clean the parts that are difficult to access with a steam nozzle wheels hinges after opening corners etc For tubes use the steam nozzle with a microfiber cloth Never direct the nozzles onto electrical boxes or actuators o...

Page 19: ...al parts shall be supplied for replacement within the term of warranty by our customer sales network determining the beginning of the term of warranty Defective parts must be returned to ensure proper application of this warranty and also to avoid any invoicing 4 5 Identification 5 CONDITIONS FOR SCRAPPING The product must be scrapped if the main requirements are no longer met particularly when th...

Page 20: ... rails if present Remove the boards by loosening the 2 Rondo screws from the frames Lower the holders to the first hole and put the pin back in 1 2 3 B Remove the two fastening clips from the foot half of the bed base Remove the foot half of the bed base and place it on the floor C Take the jack fastening clip out 1cm Tilt the base half and reinsert the clip Remove the head half of the bed base an...

Page 21: ...nd manually open the back rest so that the handle lies on the end of the base Plug into the mains and connect the variable height jack H Assemble the cross brace with the remote control in high position Tilt the bed base on the cross brace and lock with the pins handle upwards 1 D Tilt the whole towards the floor and remove the fastening clip 1 2 E Unfold the whole frame and separate the cross bra...

Page 22: ...IXL4L_IXX3L07 08 11 MEDICATLANTIC 2015_10_15 22 32 I Place the foot half of the bed base centred and laid on the base holders then tilt it so that it is resting on the cross brace bearings 6 7 1 ...

Page 23: ... the bed base and lock it on the bearings K Follow operations a b and c L Once the base half is inserted tighten the Rondo screws fully and put the safety clip in place to stop the bed base from separating c b a 2 1 M Finish by connecting the leg rest jack according to option ...

Page 24: ...ase and the bearing 2 Place the head half of the base on the base cross brace ensemble to lock it with the 2 clips 3 Place the head half of the base on the cross brace bearings and with a second person s help connect it in the other base half 4 Tighten the Rondo screws 5 Connect the variable height jack leg rest jack depending on option and plug into the mains 1 2 ...

Page 25: ...e base from separating and loosen the two Rondo screws connecting the two half bases Photos of stage L of the assembly 8 Remove the foot half of the bed base and connect the leg rest jack depending on option 9 Lower the cross brace to low position unplug from the mains and disconnect the variable height jack See stage instructions for dismantling the motors 10 Remove the two fastening clips to til...

Page 26: ...ng clip in place with the head half of the base Brake the 2 bottom wheels horizontally photo C 12 Stand the whole base up and put the head half base in place by securing it with a clip See photo of stage C of the assembly 13 Put the foot half of the base in place by securing it with two clips one on each side See photo of stage B of the assembly 14 Finish by attaching the boards and lifting pole S...

Page 27: ...armen Easy Move 120 cm wooden barriers P526 00 Carmen Easy Move 140 cm wooden barriers P546 00 Carmen Easy Move 160 cm wooden barriers P566 00 Auzence II Easy Move 120 cm P612 00 Auzence II Easy Move 140 cm P613 00 Auzence II Easy Move 160 cm P614 00 Abélia II Easy Move 120 cm P617 00 Abélia II Easy Move 140 cm P618 00 Abélia II Easy Move 160 cm P619 00 CARMEN II Easy move 120 cm wooden barriers P...

Page 28: ...ON PLUS NA 1 A616 617 S A M ACTIV NA A621 00 Easy Move base extension NA A622 00 Angled lifting pole 75 A623 00 Chromed angled lifting pole 75 A626 00 Bed loading kit NA A627 00 Transport kit Transtolit NA A630 00 Bed base extension width NA A631 00 Bed base extension width NA A632 00 Bed base extension width NA A633 00 Médicalys wall stop NA A634 00 Kit for side loading bed NA A636 00 AERYS wall ...

Page 29: ... foam of 34 kg m minimum height between 14cm min and 15 to 17cm max 120 Width 116 cm minimum with a high resilience foam of 34 kg m minimum height between 14cm min and 15 to 17cm max 140 IXL Width 136 cm minimum with a high resilience foam of 34 kg m minimum height between 14cm min and 15 to 17cm max 140 DUO Width 68 cm minimum with a high resilience foam of 27 kg m minimum height between 14cm min...

Page 30: ...sport kit can be removed only if the bed is placed on the ground on its wheels It is imperative to raise the kickstand on the ship kit before transporting the bed MEDICATLANTIC prohibits the installation of two beds in a room or in a too close space because infrared remote control will command the two beds together 9 4 Electrical connection diagram Bed base Back rest Leg rest handle Castors IV sta...

Page 31: ...6 kg 29 kg 110 kg 120cm bed XXL XPRESS Version with folding leg rest 55 kg 26 kg 35 kg 116 kg 140cm bed XXL XPRESS Version with manual crank leg rest 55 kg 29 kg 31 kg 115 kg 140cm bed XXL XPRESS Version with folding leg rest 55 kg 29 kg 39 kg 123 kg 120cm bed XXL Version with manual crank leg rest 46 kg 26 kg 29 kg 101 kg 120cm bed XXL Version with folding leg rest 46 kg 26 kg 35 kg 107 kg 140cm ...

Page 32: ...2015_10_15 32 32 Médicatlantic recommends using a patient lift with a foot height of no more than 13 5 cm 657 mm 947 mm 394 mm 553 mm Version 120 1147 mm Version 140 1347 mm Version 120 1039 mm Version 140 1239 mm Version 11 Version 08 ...

Reviews: