Page 33
Ttan Boom
TM
60-S - Operator’s Manual
September 2020
Secton 7 - Operatng Instructons & Functon Tests
Fold Down Platform Railings
ART_3382
The Titan Boom
TM
uses a pinless guard rail system����� After removing the loading gates, lift the
guard rail section and pivot to stow, or lift further to remove the rail�����
1
Remove the spring pins that secure
the loading gates����� Remove the
corner caps by lifting them straight
up�����
ART_3377
Loading Gate Spring Pin
6 places
Corner Cap
4 places
2
Slide the loading gates away from
the load area, then pivot away from
the guard rails����� Lay the gates in the
front section of the platform�����
ART_3378