MCZ EGO AIR 8 M2 Installation Manual Download Page 1

INSTALLATION GUIDE

GB

SEALED PELLET STOVE

EGO AIR 8 M2

EGO COMFORT AIR 10 M2

PART 1 - REGULATIONS AND ASSEMBLY

Translation of original instructions

Summary of Contents for EGO AIR 8 M2

Page 1: ...INSTALLATION GUIDE GB SEALED PELLET STOVE EGO AIR 8 M2 EGO COMFORT AIR 10 M2 PART 1 REGULATIONS AND ASSEMBLY Translation of original instructions...

Page 2: ...2 INSTALLATION 9 3 DRAWINGS AND TECHNICAL SPECIFICATIONS 17 4 UNPACKING 21 5 HOW THE STOVE ARRIVES 24 6 REMOVING THE TOP 25 7 FITTING THE SIDE PANELS 27 8 REMOVING THE REAR PANEL 29 9 DOOR OPENING 30...

Page 3: ...part of this manual may be translated into other languages adapted and or reproduced even in part in other mechanical and or electronic form or media for photocopies recordings or other without the p...

Page 4: ...ectronic appliances connected to it are used correctly and to prevent accidents This appliance can be used by children aged 8 years and above and persons with reduced physical sensory or mental capabi...

Page 5: ...garding spare parts Many surfaces of the product get very hot door handle glass smoke outlet pipes etc Avoid coming into contact with these parts without adequate protective clothing or suitable equip...

Page 6: ...ies and smoke outlets In the event of fire in the chimney turn off the device disconnect it from the mains and do not open the door whatsoever Then contact the competent authorities The product and th...

Page 7: ...appliance does not exceed 70 dB A Live electrical parts only power the product once it has been fully assembled Disconnecttheproductfromthe230Vpowersupplybeforeperforming anymaintenanceoperations Thep...

Page 8: ...currentENISO17225 2classA1regulation Firpelletsareusuallyusedforcertification The amount of thermal energy can vary according to the length and calorific value of the fuel This may require some adjust...

Page 9: ...nic equipment batteries or accumulators can cause the hazardous substances contained within to leak out In order to avoid harming the environment or health the user is required to separate this equipm...

Page 10: ...cessary and essential information to choose the product to install it correctly and to properly size the smoke expulsion system theProductsmustbeinstalled controlledandserviced byaqualifiedoperator ac...

Page 11: ...ueof4 4kW kg 15 moisture afterabout18monthsofseasoning thatofpelletsisaround 4 9kW kg Toensuregoodcombustion thepelletsmustbestoredinadryplaceandprotectedfromdirt Pelletsareusuallysuppliedin15 kg bags...

Page 12: ...ES Inparticular itisrecommendedtostrictlyobservethesafetydistancesfromcombustiblematerialstoavoidseriousharm to people and to the integrity of the home Installation of the appliance must ensure easy...

Page 13: ...distance 100 AIR 200 COMFORT AIR dB lower distance 0 dC upper distance 800 dP front radiation 1000 dF floor radiation 1000 dL side radiation 1000 KEY 1 FLOOR 4 FLOOR GUARD 2 FRONT FLAMMABLE MATERIAL 5...

Page 14: ...the outside and the installation room can take place with a free air inlet or by channelling the air directly to the outside3 The free air inlet must be made at floor level always be protected with an...

Page 15: ...prohibited Below 15kW Air duct diameter Maximum length smooth duct Maximum length corrugated duct 50mm 2m 1m 60mm 3m 2m 80mm 7m 4m 100mm 12m 9m Above 15kW Air duct diameter Maximum length smooth duct...

Page 16: ...In any case smoke ducts must be sealed against combustion products and any condensation For this reason it is recommended to use pipes with silicone gaskets or similar sealing devices that withstand...

Page 17: ...t of wind windproof chimneypot the height of outflow must be beyond the reflux area refer to national regulations to identify the reflux area always be built at a distance from antennas or dishes and...

Page 18: ...rules also apply for holes made in walls 2 Old flue pipe with the inclusion of an external access door for chimney cleaning 3 External flue made of insulated stainless steel pipes i e with double wal...

Page 19: ...550 500 80 1030 8 5 283 251 204 130 166 17 3 DRAWINGS ANDTECHNICAL SPECIFICATIONS Technical Dept All rights reserved Reproduction prohibited DRAWINGS AND CHARACTERISTICS EGO AIR 8 M2 STOVE DIMENSIONS...

Page 20: ...550 500 80 1030 8 5 283 251 204 130 166 164 250 18 3 DRAWINGS ANDTECHNICAL SPECIFICATIONS EGO COMFORT AIR 10 M2 STOVE DIMENSIONS...

Page 21: ...8 kg h Autonomy At min 50 h At max 14 h Heatable volume m3 147 55 231 35 405 20 Combustion air inlet 50 mm Smoke outlet 80 mm Air inlet 80 cm2 Rated electrical power EN 60335 1 62W Max 380W Supply vo...

Page 22: ...0 h Max H 11 h Heatable volume m3 182 55 286 35 500 20 Combustion air inlet 50 mm Smoke outlet 80 mm Air inlet 80 cm2 Rated electrical power EN 60335 1 81W Max 380W Supply voltage and frequency 230Vol...

Page 23: ...d handle the majolica parts with care The stoves are delivered in a single package with steel sides packaged together with the structure and placed in front of the stove Open the package remove the ca...

Page 24: ...u s 22 4 UNPACKING ToremovetheEGOstovefromthepallet youmustremovethetwoscrews u andplate s fromthestove sfoot Therearefourbrackets s REMOVING THE FASTENING BRACKETS EGO STOVES IN THE FIGURE...

Page 25: ...with the connecting pipe If the stove needs to be connected to an outlet pipe which goes through the rear wall to connect to the flue take the utmost care to make sure that the joint is not forced If...

Page 26: ...in the image below Take the box with the metal sides figure below and prepare them for installation The sides are fitted with screws for fixing to the structure Attention Carefullyhandlethemetalsidesa...

Page 27: ...reserved Reproduction prohibited To assemble the sides of the stove it is necessary to remove the top from the structure Lift the pellet cover G by simply grasping it by the handle f and pulling it to...

Page 28: ...F 26 6 REMOVINGTHETOP Now remove the entire top F and put it away safely...

Page 29: ...Dept All rights reserved Reproduction prohibited Take one of the metal sides E they are reversible and fit the silicone bumpers s on both tops of the panel Insert the holes u on the bottom of the pan...

Page 30: ...e two screws x Place the M5 notched washer z between the screw x and the panel Fit the panel on the other side in the same way After completing the installation of the metal panels refit the top F and...

Page 31: ...ohibited In case of maintenance and or interventions it is possible to remove the panel D Proceed as follows Remove the screws x and the two M5 notched washers z from the top part lift panel D so that...

Page 32: ...30 9 DOOR OPENING OPENINGTHE DOOR OFTHE FIREBOX To open the firebox door F insert the cold handle Z into the hole in the handle P and pull it towards you Attention Onlyopenthedoorwhenthestoveisoffand...

Page 33: ...material especially points that could come in contact with flammable surfaces or parts that are affected by heat e g change in shades wiring ducts plasterboard etc Moreover persons and animals must be...

Page 34: ...etypurposesandtopreventtherearwallfrombeinghitdirectlybythehotairflow generating halos blackeningorevendangerousheatinginthecaseofflammablewalls Whenpositioningthestovenearawall seeimagebelow directth...

Page 35: ...ed Thereisafuseboxalsointheswitchblocknexttothepowersocket Openthiscompartmentbysimplyliftingthecover usingascrewdriver as a lever from inside the power outlet compartment Inside there are two fuses 5...

Page 36: ...lf Whenloading donotletthepelletbagcomeintocontactwithhotsurfaces Neverremovetheprotectiongridinsidethehopper No other type of fuel other than pellets is to be inserted into the hopper in compliance w...

Page 37: ......

Page 38: ......

Page 39: ......

Page 40: ...30 09 2021 REV 0 8902103800 MCZ GROUP S p A Via La Croce n 8 33074Vigonovo di Fontanafredda PN ITALY Telephone 0434 599599 a s Fax 0434 599598 Website www mcz it e mail mcz mcz it...

Reviews: