McQuay SEASONCON ALP-037A Manual Download Page 3

INTRODUCTION

GENERAL DESCRIPTION

McQuay  type ALP SEASONCON air cooled condensing nection to any air or water cooling evaporator.
units are designed for outdoor installations and are com-

The electrical control center includes all safety and

patible with either air handling or chilled water systems. operating controls necessary for dependable automatic

Each unit is completely assembled and factory wired before operation except for the cooling thermostat since this is

evacuation, charging and testing. Each unit consists of: twin somewhat dependent upon the unit application.  Com-
air cooled condensers with integral subcooler sections. pressors and fan motors are fused in all three conductor legs

multiple accessible hermetic compressors, complete dis-

and started by their own three pole contactor.

charge piping and suction and liquid connections for con-

N O M E N C L A T U R E

A L P   089   

TTT 

PROPELLER FAN

- -   N O M I N A L   C A P A C I T Y  

INSPECTION

When the equipment is received, all items should be carefully checked against the bill of lading to insure a complete shipment.
All units should be carefully inspected for damage upon arrival. All shipping damage should be reported to the carrier and a
claim should be filed. The unit serial plate should be checked before unloading the unit to be sure that it agrees with the
power supply available.

INSTALLATION

NOTE: Installation and maintenance are to be performed only by qualified personnel who are familiar with local codes and
regulations, and experienced with this type of equipment. CAUTION: Sharp edges and coil surfaces are a potential injury
hazard. Avoid contact with them.

H A N D L I N G

Care should be taken to avoid rough handling or shock due
to dropping the unit. Do not push or pull the unit from

anything other than the base, and block the pushing vehicle
away from the unit to prevent damage to the sheet metal
cabinet and end frame (see Figure 1).

Never allow any part of the unit to fall during unloading

or moving as this may result in serious damage.

To lift the unit, 2%” diameter lifting holes are provided

in the base of the unit. Spreader bars and cables should be
arranged to prevent damage to the condenser coils or unit

cabinet (see Figure 2).

LOCATION

Due to the vertical condenser design, it is recommended

that certain precautions be taken before installation to
orient the unit so that prevailing winds blow parallel to the

unit length, thus minimizing effects on condensing pressure.

If it is not practical to orient the unit in this manner, a

wind deflecting fence should be considered.

The clearance requirements for these units are given in

Figure 3.

SERVICE ACCESS

Each end of the unit must be accessible after installation

for periodic service work. Compressors and manual liquid

line shut-off valves are accessible from the control center

end of the unit through removable access panels on unit
sizes 089B through 159B and hinged side access doors on
unit sizes 037A thru 078B.

All operational, safety and starting controls are located

in the unit control center. Capped connections for field
service gauges are also located inside these enclosures.

C A U T I O N :  Disconnect all power to the unit while ser-

vicing condenser fan drives.

FIGURE 1. SUGGESTED PUSHING ARRANGEMENT

BLOCKING REQ’D.

ACROSS FULL WIDTH

FIGURE 2. SUGGESTED LIFTING ARRANGEMENT

SPREADER

MUST 

 THESE RIGGING

HOLES FOR 

 THRU

159B. (NOTE CONTROL BOX

LOCATION.)

PAGE 3

Summary of Contents for SEASONCON ALP-037A

Page 1: ...SEASONCON PACKAGED AIR COOLED CONDENSING UNIT MODELS ALP 037A THRU 057A 067B THRU 159B GROUP mcQua PEarEx Inc 13600 Industrial Park Blvd P O Box 1551 Minneapolis Mn 55440 c...

Page 2: ......

Page 3: ...hazard Avoid contact with them HANDLING Care should be taken to avoid rough handling or shock due to dropping the unit Do not push or pull the unit from anything other than the base and block the pus...

Page 4: ......

Page 5: ......

Page 6: ...nt Risers A B are sized so that their combined cross sectional internal area will allow full load unit operation without excessive pressure drop see notes Table 4 Riser B is sized to provide adequate...

Page 7: ...S McQuay has available a Liquid Line Accessory Kit for each ALP unit size Components selected for these kits were selected on the basis of a total combined pressure drop of 7 PSI includes 100 ft of tu...

Page 8: ......

Page 9: ...2 1 l 8 74 74 I I 159B 1 90 90 FIELD WIRING Wiring should be done in accordance with all applicable codes and ordinances Warranty is voided if wiring is not in accordance with specifications An open f...

Page 10: ......

Page 11: ......

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ......

Page 29: ......

Page 30: ......

Page 31: ......

Page 32: ......

Page 33: ......

Page 34: ......

Page 35: ...seal caps Making sure control stop switch Sl is open off and pumpdown switches PSI and PS2 are on manual pumpdown throw the main power and control dis connect switches to on This will energize crankc...

Page 36: ...d compressor through the oil fill hole in the crankcase and to the Sundstrand compressor through the 3 8 inch process tube on the side of the compressor To add oil isolate the crankcase and pour or pu...

Page 37: ...ning the refrigerant piping by moving pump down switches PSI and PS2 to the manual pumpdown valve assembly position The coil can then be removed from the valve body by simply removing a nut or snap ri...

Page 38: ...s prepaid APPENDIX STANDARD CONTROLS NOTE PERFORM AN OPERATIONAL CHECK OF ALL UNIT SAFETY CONTROLS ONCE PER YEAR OIL PRESSURE SAFETY CONTROL The oil pressure safety control is a manually resettable de...

Page 39: ...orator pressure will rise The highest evaporator pressure reached before compressor re start is the cut in setting of the control FANTROL HEAD PRESSURE CONTROL FANTROL is a method of head pressure con...

Page 40: ...e to open or close the damper blades as required to maintain adequate condenser pressure The operators are factory set to begin opening the damper blades at 17Ozt 5 PSIG and to be fully open at 250 10...

Page 41: ...ould pull in instantly NOTE Line is only hot when the unit thermostat calls for compressor to run COMPRESSOR LOCKOUT OPTIONAL ALP 037A THRU 078B Compressor lockout consists of a solid state time delay...

Page 42: ...the pressure setting remove the cap on the bulb and turn the adjustment screw clock wise To lower the setting turn the screw counterclockwise Do not force the adjustment beyond the range it is designe...

Page 43: ...drier 3 Replace cartrIdge Low Suction 4 Clogged suction line or compressor suction 4 Clean strainers Pressure gas strainers 5 Expansion valve malfunctioning 5 Check and reset for proper superheat 6 Co...

Reviews: