Delivery and Lifting
When transporting the unit, it is advisable to use forklift or crane to do this work. Only the wooden skid base is allowed to
be served as the weight-supporter.
When hoisting, please keep the unit stable and without slope, meanwhile, be sure to avoid lifting cable contact with side
heat exchanger, panel and unit’s top part.
Lifting Hook
Lifting Cable
Backing Angle
After deciding the mounting location, remove the skid base by unfastening the bolts.
Mounting
When mounting, please use foundation bolts or expansion bolts to fasten the unit with foundation supporter.
It is advisable to pad the unit bottom against foundation by using vibration absorption rubber to prevent noise and
vibration.
Chilled Water Piping
Chilled water piping must be insulated and waterproof to avoid performance loss and moisture condensing on it.
To guarantee the chilled water quality, the water strainer shipped with unit must be installed on the chilled water in pipe.