Start up and shut down 

 

Pre start-up 

• 

With main switch Q10 open, check all electrical connections in control panel and starter to be sure they are 
tight and provide good electrical contact. Although connections are tightened at the factory, they may have 
loosened enough in shipment to cause a malfunction. 

• 

Verify that the automatic circuit breaker Q9 is in OFF position. 

• 

Check and inspect all water piping. Make sure flow direction is correct and piping is made to correct 
connection on evaporator and heat recovery exchanger. 

• 

Check for inlet/outlet piping proper connections as indicated on the exchangers. 

• 

Open all water flow valves to the heat recovery exchanger and evaporator. 

• 

Check all pipings for leaks. Vent the air from the evaporator and heat recovery exchanger water circuit. The 
cooler circuits should contain clean and non corrosive water. 

• 

Check pressure drop across evaporator and heat recovery exchanger, and see that water flow is correct for 
design flow rates and data. 

• 

Check the actual unit line voltage to be sure it is the same you can read on the compressor nameplate within 

±

10% and that phase voltage unbalance does not exceed 3%. 

• 

Verify that adeguate power supply and capacity is available to handle load. 

 

Start-up 

Start-up must be performed by specialized personnel: 

1. Open the compressor suction and discharge shut-off valves; always replace seal caps. 

2. Open the manual liquid line shut-off valve. 

3. Check to see that the automatic circuit breaker Q9 is in the OFF position. 

4. Check to see that the main switch Q10 (unit ON/OFF switch) is in OFF position. 

5. Verify crankcase heaters have operated at least 12 hours before start-up. Crankcase should be warm. 

6. Start the auxiliary equipment for the installation by turning on the time clock, ambient thermostat and/or 

remote ON/OFF switch cooling and chilled water pump. 

7. Check all the safety control. 

8. Switch the main switch Q10 to ON. 

9. Start the system by switching the unit circuit breakers Q9 to ON. 

 

 

Emergency stop

 

A red switch is provided on control box, to allow the unit emergency stop. The unit must be restarted following this 
procedure: 

1. Reset emergency stop switch Q11. 

2. Repeat start-up procedure from beginning. 

 

 

Summary of Contents for ALZ "B"

Page 1: ...ooled motocondensing unit ALZ B 011 1 038 2 ALP B 011 1 038 2 Cooling capacity from 40 to 145 kW 50Hz Refrigerant HFC 407C Scroll Compressors Installation and maintenance manual 304 C 02 06 D Date Jun...

Page 2: ...Repeated check the safety devices and continous cycling of control components must be analyzed and corrected before being reset The simple design of the refrigeration circuit totally eliminates potent...

Page 3: ...Min C Max C Min C Max C Min C Max C Min C Max C 011 1 8 20 4 15 4 8 15 42 013 1 8 20 4 15 4 8 15 42 017 1 8 20 4 15 4 8 14 42 020 1 8 20 4 15 4 8 12 40 022 2 8 20 4 15 4 8 15 42 025 2 8 20 4 15 4 8 1...

Page 4: ...ap heat recovery cond 2 kW 100 4 116 1 123 9 143 9 151 3 Heating capacity 2 kW 132 4 152 4 166 3 189 6 200 9 Power input heat recovery cond 2 kW 35 8 41 5 47 9 51 2 55 4 Desuperheaters heating capacit...

Page 5: ...placed on the unit base that must to be removed only after the final destination In case the unit has to be moved again a similar solution is necessary Handling and lifting Care should be taken to avo...

Page 6: ...from the obstacle fig 4 For other installation solutions consult McQuay technicians Acoustic protection The low noise levels of the ALZ units means that they meet most of the most restrictive regulati...

Page 7: ...of fan speed Full alarm management Can be linked up to serial line for supervisory telemaintenance control Can be linked up to an external terminal unit Controlled devices Compressor Condensation fans...

Page 8: ...EO high supply voltage OFF OFF OFF OFF OFF OFF EP eeprom boot OFF OFF OFF OFF OFF OFF Cn discon remote terminal Ht high temperature ON Electrical features Power supply Voltage supply range 24V 15 10 5...

Page 9: ...D7 for alarm connection jumper connector for expansion board connection digital relay outputs to manage any controlled device the Y1 GND analog output for the connection of the optional boards for the...

Page 10: ...or main board P1 pin strip relative to the Y2 analog output to be normally left open except in particular situations see parameters F3 and F4 User Interface Terminal The terminal allows the access to...

Page 11: ...alue blinks on display the alarm code appears on the LCD alternatively with the temperature value After the alarms have been cleared either with automatic reset or by pressing the and keys simultaneou...

Page 12: ...de password which is different from the USER one to prevent any unauthorized access to the data Setting the password 00 flashes on the display Pressing the t and u buttons will allow you to stop the b...

Page 13: ...isplays values Buzzer sound after 5 password for USER parameters stores parameters in eeprom stores parameters in eeprom silences the buzzer PRG SEL Normal operating condition after 5 password for FAC...

Page 14: ...a Check the actual unit line voltage to be sure it is the same you can read on the compressor nameplate within 10 and that phase voltage unbalance does not exceed 3 Verify that adeguate power supply a...

Page 15: ...304 C 02 06 D pag 15 16 ALZ ALP B Unit dimensions Fans Arrangement ALZ ALP B 011 1 020 1 ALZ ALP B 022 2 033 2 ALZ ALP B 036 2 038 2 2780 011 1 020 1 3530 022 2 033 2 4280 036 2 038 2...

Page 16: ...hanges in design and construction at any time without notice thus the cover picture is not binding McQuay Italia S P A S S Nettunense km 12 300 00040 Cecchina Roma Italia Tel 06 937311 Fax 06 9374014...

Reviews: