Service manual V1.0
Page
4
of 10
www.mcedsystems.com
2.
H
ANDLING AND INSTALLATION
1.
Unpack the unit close to the installation area.
2.
Cautiously position the unit into the wanted position. For BEF-075, two (2) people are required to lift it.
NOTE: Do not move the unit without lifting it. Damage could occur to the legs of the unit if pushed.
NOTE: Do not lift any unit by the refrigeration lines or components. Please use designated handles.
2.1.
P
LACEMENT
It is not advised to place a power pack on top of a walk-in cooler.
It is not advised to place a power pack outside without protections.
Always make sure a minimum clearance of 24 inches around and above the power pack. This is
necessary for proper air flow and servicing.
Ambient temperature ranges from 60°F to 85°F for all models.
Make sure the unit is installed in a properly ventilated area.
Unit must be connected to a ground fault circuit breaker.
Power pack and pump must have their own dedicated electrical circuit.
2.2.
BEF-02
INSTALLATION
1.
Clamp and insulate both glycol lines to the pump outlet and to the unit return fitting.
2.
Clean the reservoir.
3.
Fill the reservoir with
propylene glycol
solution (mixed 2 parts water to 1 part glycol).
4.
Place the cover on the unit.
5.
Plug the pump in the electrical box on the unit.
6.
Plug the unit to an appropriate electrical circuit. This task should be executed by a professional
electrician in compliance with national electrical standards.
7.
Inspect the unit for any leakage.
8.
Glycol temperature should be adjusted to 28°F. Set point should be reached within a few hours.
NOTE: To adjust the glycol temperature, please see section 2.4.