Figure 7. The USB-to-serial adapter connected to the JTAG header on the DS8005 with a standard 10-pin
ribbon cable.
Figure 8. MTK2 after successfully connecting to the MaxQ Bootloader.
Finally, to load the example code, select
File
Master Erase
if the option is not already selected (indicated
by a check mark), then select
File
Load Code
and locate and open the DS8005_EK.hex file. This will take
several seconds as the code size is relatively large. Once MTK is done, it will output a message showing that
the load completed successfully (
Figure 9
). Select
Target
Disconnect from loader
to release the
MAXQ622 from reset and begin code execution. Removal of the ribbon cable is optional. If the ribbon cable is
removed, power will be removed as well, and the regulated power supply will need to be plugged in to provide
Page 9 of 22