Page 39 of 54
5100054
BND01O03.docx
11.
Maintenance
WARNING – Risk of injury
If components have become loose or you are not sure whether the
components are still in good order, please advise the relevant service
technician of the company responsible for the installation.
Stop all use of the device until the damage is rectified:
Disconnect the system from the mains. Do not stand or work beneath
the system.
WARNING – Electric shock
Every effort must be made to ensure that the electricity power supply
to the entire system is disconnected when conducting any maintenance
work.
Danger of death!
A
qualified service technician
must carry out the following checks every 2 years. After
8 years the checks have to be done annually!
11.1.
Maintenance Check List
Visual Inspection:
The ceiling column flange plate is flush with
the raw ceiling respectively the substructure
is correctly in place
①
.
The ceiling column flange is safely connected
and its connection parts
②
free of damage.
The decorative sleeve and the countersunk
screw
①
at the ceiling column are securely
in place and free of damage.
All screws
①
connecting the socket
attachments to the rectangular tube at the
extension arms are securely in place.
①
②
①