Installation

Pressure

Pressure

Pressure Gauges

Gauges

Gauges

A pressure gauge may be added at the inlet tee and
outlet tee fittings. Use gauges with stainless steel
wetted parts and 1/4 in. npt(m) threads.

Electrical

Electrical

Electrical Connections

Connections

Connections

To avoid injury from fire, explosion, or electric
shock, all electrical wiring must be done by a
qualified electrician and comply with all local codes
and regulations for C1D1 electrical connection.

Wire

Wire

Wire Connections

Connections

Connections at

at

at the

the

the C1D1

C1D1

C1D1 Motor

Motor

Motor

Install the wiring at the motor as follows:

1.

Open the motor’s electrical box.

2.

Install wiring system with proper connections
to the motor electrical box. A C1D1 installation
requires conduit or armored cable with sealing
fittings in accordance with NFPA 70.

3.

For

For

For 460V,

460V,

460V, 3

3

3 Phase,

Phase,

Phase, Wiring:

Wiring:

Wiring: Connect wire L1 to

T1, L2 to T2, and L3 to T3, and bridge the other
wires, as shown.

T1

T2

T3

L1

L2

L3

T4

T7

T5

T8

T6

T9

4.

For

For

For 230V,

230V,

230V, 3

3

3 Phase,

Phase,

Phase, Wiring:

Wiring:

Wiring: Bridge the wires as

shown. Then, connect L1 to T1/T7, L2 to T2/T8,
and L3 to T3/T9.

T1

T7

T2

L1

L2

L3

T8

T3

T9

T4

T5

T6

5.

Option:

Option:

Option: Connect thermostat wires P1 and P2 to
external overload detection. Thermostat is NC
(normally closed).

6.

Close the motor electrical box. Torque the
screws to 20 in-lb (2.3 N•m).

8

3A6887A

Summary of Contents for 25M869

Page 1: ...s Recovery Electric Powered Dual Diaphragm Hazardous Location Motor Stainless Steel Wetted Parts Rated MAWP LPG 375 PSI For professional use only Important Safety Instructions Read all warnings and in...

Page 2: ...ief Procedure 9 Pump Shutdown 9 Maintenance 10 Maintenance Schedule 10 Tighten Threaded Connections 10 Flushing and Storage 10 Torque Instructions 10 Dimensions 12 Technical Data 13 MVP Standard Warra...

Page 3: ...urce All electrical wiring must be done by a qualified electrician and comply with all local codes and regulations WARNING FIRE FIRE FIRE AND AND AND EXPLOSION EXPLOSION EXPLOSION HAZARD HAZARD HAZARD...

Page 4: ...heet SDS from distributor or retailer Turn off all equipment and follow the Pressure Pressure Pressure Relief Relief Relief Procedure Procedure Procedure when equipment is not in use Check equipment d...

Page 5: ...touch hot equipment PERSONAL PERSONAL PERSONAL PROTECTIVE PROTECTIVE PROTECTIVE EQUIPMENT EQUIPMENT EQUIPMENT Wear appropriate protective equipment when in the work area to help prevent serious injury...

Page 6: ...P Parts and Accessories Be sure all accessories are adequately sized and pressure rated to meet the system s requirements Reference letters in the text for example A refer to the callouts in the figur...

Page 7: ...ON OFF ON OFF ON OFF switch switch switch or or or motor motor motor starter starter starter Ground through a proper connection to the electrical system Refer to the manufacturer s instructions for gr...

Page 8: ...s follows 1 Open the motor s electrical box 2 Install wiring system with proper connections to the motor electrical box A C1D1 installation requires conduit or armored cable with sealing fittings in a...

Page 9: ...Running Running Running the the the Pump Pump Pump 1 Be sure the system is properly grounded See Grounding page 7 2 Check fittings to be sure they are tight Tighten inlet and outlet fittings securely...

Page 10: ...owest possible pressure Flush before first use Flush at the lowest pressure possible Check connectors for leaks and tighten as necessary Flush with a fluid that is compatible with the LP Gas being dis...

Page 11: ...Notes Notes Notes Notes 3A6887A 11...

Page 12: ...Dimensions Dimensions Ref Inches cm A A A 17 0 43 2 B B B 46 4 117 9 C C C 39 0 99 1 D D D 8 5 21 6 E E E 22 8 57 9 F F F 9 6 24 4 G G G 14 9 37 8 H H H 12 0 30 5 J J J 10 2 25 9 K K K 14 5 36 8 L L L...

Page 13: ...sumption 0 2 scfh 0 006 cubic meters hour CO2 inlet size 1 4 in npt f Maximum pump speed 174 cpm Process Inlet and Outlet Size 1 in JIC male Optional pressure gauge ports inlet and outlet 1 4 in npt f...

Page 14: ...ion for breach of warranty must be brought within two 2 years of the date of sale MVP MVP MVP MAKES MAKES MAKES NO NO NO WARRANTY WARRANTY WARRANTY AND AND AND DISCLAIMS DISCLAIMS DISCLAIMS ALL ALL AL...

Reviews: