HAVING TROUBLE? CALL SUPPORT AT: 320.340.6464
SSBK-240 BOOM ASSEMBL
Y
240-AC
TOOLS
PARTS
For each Nozzle Body, insert a Strainer, Gasket and Deflector Fan
Nozzle as shown here.
Push Nozzle Cap onto the Nozzle Body and twist to secure it.
Repeat for remaining Nozzle.
Installs Nozzles, Strainers & Caps
1.
None
TOOLS
2.
Extend the Boom Arms and align the end holes as shown.
Insert the ¾” Bolts through the holes and secure with Flange
Nuts. Tighten with Socket Wrench.
Connects Boom Arms
PARTS
Deflector Nozzle (2)
DF3.0
Flange Nuts (8)
33-100113
1” Bolts (6)
33-100116
7’ Boom Assembly (1)
34-140052-P
TOOLS REQUIRED
NOTE:
IF YOU PURCHASED A COMPLETED BROADCAST SPRAYER,
FOLLOW THE SPOT SPRAYER MANUAL AND MOUNT KIT
ASSEMBLY INSTRUCTIONS BEFORE YOU COMPLETE BOOM
ASSEMBLY STEPS.
1/2” SOCKET WRENCH
KNIFE
INCLUDED
COMPONENTS
PRAYING
IMPLE
S
MOBILE SPRAY ASSISTANT
INTEGRATE YOUR SPRAY EQUIPMENT AND ACREAGE. CALCULATE YOUR NEEDED LIQUID AND APPLICATION SPEED.
Boom Upright Bracket (2)
31-100160
FREE
Gasket (2)
G-G00002020
Ball Check Strainer (2)
NS-50BC
Deflector Nozzle Cap (2)
G-8253051
NOTE: ¾” Bolts will be
pre-installed onto Boom
Assembly.