45
546001.A.6 - July 17, 2019
ENG
STEP 13
To secure the Side Tables at the front of the grill body, insert screws (B x2) as shown below.
STEP 14
Attach the Side Burner Jet to the Side Burner using screws (B x2) at location Z. Then attach the bottom cover panel by sliding into
place under the Side Burner.
Summary of Contents for MB
Page 2: ...2 546001 A 6 July 17 2019 ...
Page 18: ...18 546001 A 6 July 17 2019 SCHRITT 15 Seitenbrenner Anschluss SCHRITT 16 Eisbox Montage ...
Page 31: ...31 546001 A 6 July 17 2019 GER ...
Page 46: ...46 546001 A 6 July 17 2019 STEP 15 Side Burner connection STEP 16 Icebox assembly ...
Page 67: ...SL OVEN IA N 67 546001 A 6 July 17 2019 KORAK 7 Montirajte pokrov in žar na ohišje vozička ...
Page 93: ...U K R A N IA N 93 546001 A 6 July 17 2019 КРОК 7 Встановіть гриль з кришкою на основу корпус ...
Page 111: ...U K R A N IA N 111 546001 A 6 July 17 2019 ...
Page 139: ...H U N GA R IA N 139 546001 A 6 July 17 2019 ...
Page 255: ...POL ISH 255 546001 A 6 July 17 2019 KROK 7 Zamontuj zespół pokrywy i grilla do wózka ...
Page 272: ...Urheberrechte 2019 Masport Begrenzt AL KO Geräte GmbH Ichenhauser Str 14 D 89359 Kötz Germany ...