12
!
CAUTION
Step 1: Removing the Door and Hinges
Hold the door secure in the closed position and remove
Hinge Pin from the Upper Hinge using a 1/8” Hex Key tool.
Slowly remove the door by sliding outward away from the
cabinet and lift to remove off the Lower Hinge. If reversing
the door, remove hinges from cabinet per Door Reversal
Instructions.
Remove the hinge bushing from the adaptor plate. A new
bushing is included in the literature pack with your unit.
Cut and prepare panels according to the information
provided in the Integrated Panel Dimensions section.
It is important to use the factory provided grille that came
with the product to assure proper air flow is maintained
through the condenser. The use of a custom grille is not
recommended and will void the warranty.
INTEGRATED DOOR PANEL INSTALLATION
Step 2: Remove the Door Gasket
With the door laying on a flat surface and starting at a
corner of the door, remove the magnetic door gasket from
the interior side of the door. Set the gasket aside on a flat
surface.
There are 10 holes in the gasket retainer extrusions (3 on
each side and 2 at the top and bottom) which are used to
fasten the panel to the front of the door. The screws are
provided in the literature pack.
Step 3: Assemble the Panel to the Door
The preferred method of attaching the panel to the door
is to clamp the panel to the door so it cannot move while
drilling the screw pilot holes. Use bar clamps or "C" clamps
with pads on the clamping surfaces that will not mar the
panel or the door. The custom panel should be flush with
the top of the door and centered along the width of the
door. Drill holes through the gasket extrusion using the 10
holes as pilot holes. Use the drill size from the chart in the
table below being careful not to drill through the front sur-
face of the panel. Fasten the panel to the door with the 10
screws provided in the literature pack. Remove the clamps
and replace the gasket in the gasket extrusion channels of
the door. Some force may be required to seat the gasket
into the channels. Be sure the gasket corners are seated
properly.
Integrated panel
flush with top of
door
Integrated panel
flush with top of
door
Holes in gasket
container
Material Type
#10 Wood Screw
Hardwood
1
⁄
8
" (3.2 mm) Diameter. Pilot Hole
Softwood
7
⁄
64
(2.8 mm) Diameter. Pilot Hole
9