background image

INSTALLATION INSTRUCTIONS AND HOLE-CUTTING TEMPLATE 

IIRTEC

® 

BATHROOM  HEATER LINEAR 

HALOGEN HEAT / LED LIGH T/ FAN 3 IN 1 

Dear customers, 

Thank you for selecting Martec  Bathroom Heater Linear 3  in  1. Please 

read all instructions before commencing installation. 

IMPORTANT: This unit must be installed to comply with the appropriate 

council  regulations  and  the  Australia  and  New  Zealand  wiring  rules 

AS/NZS3000:2000 or lastest edition thereof. 

The main  supply and interconnecting cables required for installation  of 

this unit are not included. 

WARNING 

-

INSTALLATION ONLY TO BE BY QUALIFIED PERSONS 

1. Use this  heater only as described in this manual. The manufacturer

does  not  recommend  any  other  use  as  this  may  cause  fire,  electric

shock,  or  injury  to  persons.  If  you  have  questions,  contact  the

manufacture or local agent.

2. All wiring must be carried out by a Licensed Electrician in accordance

with all applicable codes and standards.

3. Make sure the power is off before the installation.

4. When cutting into the wall, do not damage electrical wiring and other

hidden utilities.

5.The heater must be properly grounded.

6.The heat lamp and glass shield are hot when in use. Do not touch the

heat lamp and glass shield with any part of your body when in use.

7. For  the  purpose  of  avoiding  any  dangerous  gas  leaking  into  your

bathroom, the ventiduct of the heater must not be laid together with the

ventiduct of air-fueled water heater or other open-fire appliances into the

same flue.

8. The disconnection may be  achieved by having the plug accessible or

by incorporating a switch in the fixed wiring in accordance with the wiring

rules. The heater must be isolated from the power by means of a plug or

all-pole disconnection switch with a contact separation of at least 3mm in

each pole.

9. The power cable must stand a minimum  1 OA load.

10. The appliance is not intended for use by persons (including children)

with  reduced  physical,  sensory  or  mental  capabilities,  or  lack  of

experience and knowledge, unless they have been given supervision or

instruction concerning use of the appliance by a person responsible for

their safety.

11. Children  should be supervised to ensure  that they do  not play  with

the appliance.

12. The  heater  is  to be installed  so  that  switches  and  other  controls

cannot be touched by a person in the bath or shower.

13. The  appliance  shall,  under  no  circumstances,  be  covered  with

insulating material or similar material.

14. Regulations concerning the discharge of air have to be fulfilled.

15. Joists,  beams and  rafters  shall not be cut  or notched  to install the

appliance.

Read and save these instructions! 

IMPORTANT CONSIDERATIONS BEFORE INSTALLING 

A few minutes of  planning can  make a big difference  to the installation 

time and also to your satisfaction with the function of the unit. 

1. The unit should not be installed directly above a shower or bathtub. The

unit must not be  installed in a position where water may splash onto the

unit.

2. The unit must not be installed beneath a fixed socket or power outlet.

3. The unit is designed for installation in flat ceilings only. Do not mount it

on a sloping ceiling or a vertical wall.

4. The heat lamp is most effective when you are standing directly beneath

them,  so generally the unit would be  mounted a place where you would

stand to dry yourself.

5. For  the  exhaust  fan  to  work  efficiently,  replacement  air  of  a  volume

equivalent  to  what  is  being  extracted  must  be  able to  enter  the  room.

Generally, this air would be  drawn under the  door,  or through  a slightly

open window. If the room is airtight, the fan will function poorly.

6. Before commencing any cutting, check in the ceiling space that there

are no obstructions such as ceiling joists and that there is sufficient height

clearance for the housing. Check that the electrical wiring can  be routed

from the wall switches to the mounting location.

INSTALLATION 

1. Cutting a vent

Locate  a  vent  position  (above  the  ceiling)  on  the  wall,  and  then  cut  a

155mm diameter hole at this very position.

2. Ducting

Put one end of the  150mm diameter ventiduct into the vent hole and seal

space  around  the  hole  using  a  suitable  sealant  and  cowling  where

necessary.

Note: 

Since  the  length  of  each  duct  is  3.0m,  make  sure  that  from  the 

centre of installation position there should be a distance within 3.0m to the 

outside vent. 

3. Suitable loacation

For the purpose of obtaining the best heating results, the heater should be

no more than 2.3m from the ground after the heater is well fixed.

wall 

duct cli 

sealant  ventiduct 

ceilin  ·oist  ceiling 

Wall venting shown 

bathroom 

heater 

fascia 

;::, 2

1

0mm 

ceiling joist  ceiling

� 

4. Prepare the ceiling

Select  the  mounting  position  for  the  unit.  Before commencing  any

cutting, check in the ceiling space that there are no obstructions such

as joints and that there is sufficient height clearance for the housing.

Cut around the attached hole-cutting template and use this template 

to mark the hole outline on the ceiling. 

Make  sure  a  distance  between  the  edges  and wall  is  no  less than 

250mm.  Also from  the rooftop should be a minimum 210mm height 

to the ceiling. 

5. Remove the fascia

Remove  4  silicon  clips  at  2

ends of the rectangle air  inlet

grilles.  Remove  the  screws

hidden  inside.  Remove  the

fascia.

Note: 

Hold the fascia carefully

with  hand while  removing the

screws  so  that  the  fascia

doesn't fall to ground.

6. Remove the lamps

Heater Unit 

Rubber clip 

6,  Glass shield

Screw 

behind 

rubber

Air inlet  rille

1) Remove 4 LED lamps from the heat unit and keep them in a safe

place.

2) The heat lamp is not installed on the  unit. It is packed together with

the glass shield inside a separate foam package, please keep it in  a

safe place.

7. Wiring

Connect one end of the  interconnecting wire with the  switch panel,

and  then  drag  the  other  end power  cable  out  of  the  hole  on  the

ceiling.  Open  the  terminal  block  cover  on  the  housing  and  make

connection  as  the  wiring  diagram  instructs,  then  reposition  the

terminal block cover. Tuck the redundant wire into the ceiling so as to

leave the housing enough room to fix in.

Note: 

Ensure that  the power  is  turned  off  before  carrying  out  any 

work on electrical installations. 

cable 

Terminal 

Blocks 

-

-

-. 

�-l-nl1Qlfn-1--

1

I

:I

:

1N 

Q, 

.____._: 

-l-Cl�t�fO!-

----,

:  IR 

�: 

'-_J_L_l__l__.:-

-l-0  N 

o+-

-, 

... 

. .  . 

.... 

..  -�· 

,__ 

_._ 

___ _

o+-,

e :Thermal protector 

Sc 

IR:Heat lamp 

-

-

� 

IN:Light lamp 

� 

V

K2 

M:Motor  C:Capacitor 

Vc 

K: All-pole disconnection switch 

Please use this card as hole cutting template 455mm x 305mm. 

Reviews: