![Marsh PatrionPlus Technical Manual Download Page 44](http://html1.mh-extra.com/html/marsh/patrionplus/patrionplus_technical-manual_1730813044.webp)
Installation
3-3
Establishing Locations
Before beginning installation it is important to establish locations for all
system components. No printhead should be more than 100 feet (30.5 m)
away from the controller. (See “Recommended Distances” on page 2-33 for
details.)
Consider the following questions:
• Does the location allow for easy maintenance of the system?
• Is a power source available? The controller and power supply should be
connected to the same AC outlet sourcce to ensure that power is applied
to both items properly.
• If using an ADS ink system, is there an available air supply source?
• Is there adequate space for cables behind the controller?
• How long are the data lines and other cables?
• What optional equipment does the system need?
Conveyor Direction
After establishing a mounting location on the production line for your
printheads, determine the conveyor direction. Stand behind the printhead
to determine if the product will pass by the printhead in a right to left
(Forward Print) or left to right (Reverse Print) direction. When you
configure your printheads you will set the conveyor direction. (See
“Printhead Configuration” on page 4-9.)
Summary of Contents for PatrionPlus
Page 41: ...Installation ii 29669 02080 Rev AF...
Page 72: ...Operation iv 29669 02080 Rev AG...
Page 153: ...Maintenance ii 29669 02012 Rev AF...
Page 161: ...Troubleshooting ii 29669 02080 Rev AF...
Page 184: ...Repair ii 29669 02080 Rev AF...
Page 212: ...Parts List ii 29669 02080 Rev AF...