Marchetti System 100x180 Instructions For Use And Maintenance Manual Download Page 1

ENG

1

www.marchetti.eu

Instructions Manual EN 1298 – IM – it x en 

Mobile access towers must only be used for finishing, maintenance and similar works. This instructions 

manual contains important instructions on use, maintenance and safety of the mobile access tower; 

the operator must be completely aware of them before use. Strictly complying with this manual 

means working in compliance with the provisions of the current standard on health and safety in the 

workplace Leg. Decree. 09.04.2008 no. 81.

Code 10731

CUSTOMER ASSISTANCE DOCUMENT

NR. 35 REV. 8 OF 27/08/2020

MARCHETTI S.r.l. 

Via Piemonte, 22

06062 Città della Pieve - Perugia - Italy

[email protected]

www.marchetti.eu

Instructions for use 

and maintenance

The products identified in this handbook have been ma-

nufactured by MARCHETTI s.r.l. With QUALITY SYSTEM 

MANAGEMENT, certified by Tuv Italia, in accordance with 

ISO 9001

MOBILE ACCESS TOWER

SYSTEM

System 120x200
System 120x180
System 100x200 
System 100x180 
System   75x200 
System   75x180

European standard EN 1004

Summary of Contents for System 100x180

Page 1: ...the current standard on health and safety in the workplace Leg Decree 09 04 2008 no 81 Code 10731 CUSTOMER ASSISTANCE DOCUMENT NR 35 REV 8 OF 27 08 2020 MARCHETTI S r l Via Piemonte 22 06062 Citt del...

Page 2: ...nt to applicable norms The guarantee is immediately effective and is ratified by the invoice accompanying the goods A product found to be faulty is guaranteed We shall accept no responsibility for pro...

Page 3: ...EN 1004 3 7 7 XXCD System 75x180 working tower EN 1004 3 7 7 XXCD manufactured in compliance with Leg Decree 81 08 and Technical Standard EN 1004 Class of loads distributed uniformly equal to 3 2 0 KN...

Page 4: ...Super 35 stabilizers must be fitted to towers with work platform above m 5 00 and when the tower is completely exposed to the wind for example in the middle of a square next to a structure such as a...

Page 5: ...e prototype which has surpassed rigidity testing pursuant to Appendix A of the Technical Standard EN 1004 2005 and that it was subject with a positive outcome with the ASSESSMENT as outlined in point...

Page 6: ...4 4 5 30523 Handgrip screw M14x50 0 14 4 4 4 4 4 4 4 4 20583 TOWER 10 20556 Bearing frame 120 9 50 2 4 6 8 10 12 14 16 11 20563 Connecting brace 200 3 90 2 4 6 8 10 12 14 16 12 20564 Diagonal bracing...

Page 7: ...t trapdoor 180x51 13 64 1 1 1 2 2 2 3 3 27 Short toeboard 180 1 59 2 2 2 4 4 4 6 6 20749 COMPLETE GUARDRAILS 17 20631 Long guardrail 180 5 10 2 2 2 2 2 2 2 2 18 20784 Short guardrail 120 2 30 2 2 2 2...

Page 8: ...rchetti eu COMPONENTS ELEMENTS 28 Guardrail bars Work platform Tower H 1 50 m 10 12 17 18 Guardrail 3 2 4 5 Extractable base 11 Terminal tower H 0 90 m 22 21 11 26 27 24 25 20 19 SYSTEM 120X200 SYSTEM...

Page 9: ...FIGURATION INSIDE OF BUILDING CONFIGURATIONS A1T A2T A3T A4T A5T B6T B7T H max mobile tower m 2 90 4 40 5 90 7 40 8 90 10 40 11 90 H max work platform m 1 90 3 40 4 90 6 40 7 90 9 40 10 90 H tower H 1...

Page 10: ...3 50 4 4 4 4 4 4 5 30523 Handgrip screw M14x50 0 14 4 4 4 4 4 4 20587 TOWER 6 20558 Bearing frame 100 8 40 2 4 6 8 10 12 7 20563 Connecting brace 200 3 90 2 4 6 8 10 12 8 20564 Diagonal bracing 200 1...

Page 11: ...trapdoor 180x36 11 22 1 1 1 2 2 2 23 Short toeboard 100 1 39 2 2 2 4 4 4 20747 COMPLETE GUARDRAILS 15 20631 Long guardrail 180 5 50 2 2 2 2 2 2 16 20785 Short guardrail 100 2 00 2 2 2 2 2 2 GUARDRAIL...

Page 12: ...marchetti eu COMPONENTS ELEMENTS 24 Guardrail bars Work platform Tower H 1 50 m 6 8 15 16 Guardrail 3 2 4 5 Extractable base 7 Terminal tower H 0 90 m 10 9 7 22 23 20 21 18 17 SYSTEM 100X200 SYSTEM 1...

Page 13: ...T A5T H max mobile tower m 2 90 4 40 5 90 7 40 8 90 H max work platform m 1 90 3 40 4 90 6 40 7 90 Tower H 1 50 m n 1 2 3 4 5 Tower H 0 90 m n 1 1 1 1 1 Work platform with parapet n 1 1 2 2 2 Complete...

Page 14: ...1 1 1 2 2 12 Short toeboard 75 1 60 2 2 2 4 4 13 Long toeboard 200 4 60 2 2 2 4 4 20750 COMPLETE GUARDRAILS 14 20632 Long guardrail 200 5 50 2 2 2 2 2 15 20786 Short guardrail 75 1 70 2 2 2 2 2 GUARDR...

Page 15: ...80x60 12 50 1 1 1 2 2 12 Short toeboard 75 1 60 2 2 2 4 4 13 Long toeboard 180 4 20 2 2 2 4 4 20751 COMPLETE GUARDRAILS 14 20631 Long guardrail 180 5 10 2 2 2 2 2 15 20786 Short guardrail 75 1 70 2 2...

Page 16: ...ww marchetti eu COMPONENTS ELEMENTS 19 Guardrail bars Work platform Tower H 1 50 m 6 8 14 15 Guardrail 3 2 4 5 Extractable base 7 Terminal tower H 0 90 m 10 9 7 11 12 13 17 16 SYSTEM 75X200 SYSTEM 75X...

Page 17: ...ONS A1T A2T A3T A4T H max mobile tower m 2 90 4 40 5 90 7 40 H max work platform m 1 90 3 40 4 90 6 40 H tower H 1 50 m n 1 2 3 4 H tower H 0 90 m n 1 1 1 1 Work platform with parapet n 1 1 2 2 Comple...

Page 18: ...ities are listed Damaged components must not be used Only original components indicated by the manufacturer may be used SAFETY PLATFORM D Lgs 09 04 2008 n 81 Sez IV art 128 The Safety Platform constru...

Page 19: ...irst two lateral frames First position the 2 long toeboards parallel to the walking surface Now fit the 2 short toeboards into the respective housings found in the long boards At this point at least o...

Page 20: ...y is complete insert the caps packaged together with this manual in the Wheel bearing section in the terminal horizontal bracing to preserve the scaffolding For passage platform use the steel guardrai...

Page 21: ...ngs must be secured to the building or other structure Tools and materials must be lifted from the inside of the tower from one platform to another through the trapdoors using manual traction with app...

Page 22: ...e in a covered and sheltered place is recommended to reduce damage due to corrosion over time USE ACCORDING TO D LGS 81 08 All the mobile access towers pursuant to D Lgs 81 08 but not to EN 1004 stand...

Page 23: ...eir use in the case of use according to EN 1004 refer to the handbook attached for the two towers of the System 120 series the maximum work platform height allowed is 7 90 m if used outside buildings...

Page 24: ...The maximum height difference between the walkway of the scaffolding and the landing surface must not exceed 16 cm If necessary correct the height of the scaffolding only using the methods indicated i...

Page 25: ...ENG 25...

Page 26: ...welding Lubrication of tightening screws Lubrication of pins and sleeves Efficiency of wheels and braking devices Integrity of work platforms Integrity of railings Integrity of toe boards Integrity of...

Page 27: ...Lubrication of tightening screws Lubrication of pins and sleeves Efficiency of wheels and braking devices Integrity of work platforms Integrity of railings Integrity of toe boards Integrity of Instru...

Page 28: ...welding Lubrication of tightening screws Lubrication of pins and sleeves Efficiency of wheels and braking devices Integrity of work platforms Integrity of railings Integrity of toe boards Integrity of...

Page 29: ...Lubrication of tightening screws Lubrication of pins and sleeves Efficiency of wheels and braking devices Integrity of work platforms Integrity of railings Integrity of toe boards Integrity of Instru...

Page 30: ...welding Lubrication of tightening screws Lubrication of pins and sleeves Efficiency of wheels and braking devices Integrity of work platforms Integrity of railings Integrity of toe boards Integrity of...

Page 31: ...Lubrication of tightening screws Lubrication of pins and sleeves Efficiency of wheels and braking devices Integrity of work platforms Integrity of railings Integrity of toe boards Integrity of Instru...

Page 32: ...32 www marchetti eu www marchetti eu MARCHETTI S r l Via Piemonte 22 06062 Citt della Pieve Perugia Italy info marchetti eu www marchetti eu...

Reviews: