Installation Instructions
Section 2
8
Part Number 000007651 05/10
Installation Checklist
Before Starting the Ice Machine
All Manitowoc ice machines are factory-operated and
adjusted before shipment. Normally, new installations do
not require any adjustment.
To ensure proper operation, follow the Operational
Checks in Section 3 of this manual. Starting the ice
machine and completing the Operational Checks are the
responsibilities of the owner/operator.
The float valve setting must be checked to verify it is
correctly set. An adjustment may be necessary to
obtained the proper water level.
Adjustments and maintenance procedures outlined in
this manual are not covered by the warranty.
X
Installation Checklist Items
Is the Ice Machine level?
Has all of the internal packing been removed?
Have all of the electrical and water connections
been made?
Has the supply voltage been tested and checked
against the rating on the nameplate?
Is there proper clearance around the ice machine
for air circulation?
Has the ice machine been installed where ambient
temperatures will remain in the range of 45° -
110°F (7° - 43°C)?
Has the ice machine been installed where the
incoming water temperature will remain in the
range of 45° - 90°F (7° - 32°C)?
Are all electrical leads free from contact with
refrigeration lines and moving equipment?
Has the owner/operator been instructed regarding
maintenance and the use of Manitowoc Cleaner
and Sanitizer?
Has the warranty registration card been sent to the
factory?
Has the ice machine and bin been sanitized?
Has this manual been given to the owner/
operator?
Is the water level (float valve) set correctly?
Has the toggle switch been placed in the ice
position? (Switch is located near the bottom of the
front cover)
!
Warning
Potential Personal Injury Situation
Do not operate equipment that has been misused.
abused, neglected, damaged, or altered/modified
from that of original manufactured specifications.