![Manitowoc NBT60XL Operator'S Manual Download Page 72](http://html.mh-extra.com/html/manitowoc/nbt60xl/nbt60xl_operators-manual_701284072.webp)
CONTROLS AND OPERATING PROCEDURES
OPERATOR MANUAL
NBT60XL
3-14
Published 11-01-2020 Control # 710-00
The RCL is bypassed only as long as the switches are in the
ON position. When overridden, warning icons appear on the
RCL display. For more information, see “About the RCL and
ATB Override Warnings” on page 7-7.
Turning the key switch to the ON position re-engages the
boom down, telescope out and hoist up controls. These
functions were disabled when an overload condition was
sensed by the RCL. It is important to read and understand
the RCL Override information before using the RCL override
on/off switch. For information concerning the operation and
maintenance of the RCL system, see Section 7 - Rated
Capacity Limiter in this manual.
Emergency Stop Switch
The crane emergency stop switch (9, Figure 3-4) is located
on the cab console and is used to shut down the truck engine
in an emergency. Push the red button in to shut down the
engine, rotate the knob and pull out to resume normally
operation.
NOTE:
Use only the emergency stop switch in the case of
an emergency to shut down the engine. Do not use
the emergency stop switch regularly as a means of
turning off the machine.
AC/Heater Vent
The cab has air conditioner and heating vents (10,
Figure 3-4), located on the control panel, behind the panel,
under the seat, and at head level.
Crane Ignition Switch
The crane ignition switch (11, Figure 3-4) is located on the
crane cab console and controls the truck engine and crane
cab power. The ignition switch has three positions:
•
OFF shuts down engine and cab power
•
ON activates truck engine ignition and all cab power
•
Start is truck engine start
For more information about the ignition states, see
12V Receptacle
This 12 volt accessory outlet (12, Figure 3-4) is located on
the lower part of the front control panel and is designed to
mate with most 12 volt adapter plugs.
Display USB Port
The Display USB Port (13, Figure 3-4) is located on the front
control panel. Use this port to install and update RCL display
software.
Diagnostic Connector—CCS RCL Module
The diagnostic connector (46, Figure 3-4) is located on the
lower part of the front control panel. It is used for servicing
the Crane Control System (CCS) RCL control module.
A laptop computer with a USB connection, CAN bus, grid
connect tool, and the appropriate software are required.
Contact Manitowoc Crane Care to obtain the appropriate
diagnostic cable.
Diagnostic Connector—Display USB-B Port
The display USB-B port (43, Figure 3-4) located on front
control panel is used for downloading software and
diagnostic troubleshooting. It is used for servicing the RCL
system.
A laptop computer with a USB connector and the appropriate
electrical system software is required. Contact Manitowoc
Crane Care to obtain the appropriate diagnostic cables.
PC1 Interface Connector
The PC1 interface connector (44, Figure 3-4) located on the
fuse relay panel behind the cab seat is for advanced
diagnostics of the main CAN bus when the crane is serviced.
OVERRIDE
position shown
FIGURE 3-7
Buzzer
9602
2
1
r
Reference
Only