![Manitowoc National Crane NBT40 Series Service Manual Download Page 85](http://html.mh-extra.com/html/manitowoc/national-crane-nbt40-series/national-crane-nbt40-series_service-manual_701276085.webp)
4
10
National Crane
Published 8-01-2017 Control # 287-11
4-11
NBT40 SERVICE MANUAL BOOM
MAINTENANCE
(3). Install 4/3/2 retract cable keeper (78) into anchor
plates at the base of the fourth stage boom.
20.
Assemble and install the 4/3/2 retract-1/2/3 extend pin
assembly (38) into anchor plate at the bottom base of
the 3rd stage boom (3).
a.
Install one retainer (37) and one washer (36) inside
of each sheave.
b.
Install bushing (35) into double groove sheave (34)
and brush with chassis grease and install on both
ends of pin.
c.
Loop 4/3/2 retract cables (53) around double
grooved sheaves (34) and pin (38) assembly.
d.
Install plug (64) in end of pin (38).
e.
Install shaft assembly into retainer at base of 3rd
stage boom (3).
f.
Install grease fittings (43) toward base of boom.
21.
Apply multipurpose grease (MPG) to grease fittings.
22.
Install retract cable guides (65) with capscrew (74) into
the base of the 3rd stage boom.
NOTE:
Use caution when moving cylinder to avoid
damage to cable guides (65).
23.
Lower the extend cylinder onto wear pad (112).
3rd and 2nd Section Boom
1.
Install two top wear pad mounting plates (152), wear
pads (158), with capscrew (156), washer (155) onto the
base of the 3rd stage boom (3).
NOTE:
Apply multipurpose grease (MPG) to all wear pads
and contact surfaces.
2.
Install adjustment cam plate (154), capscrews (156) and
flatwashers (155).
3.
Rotate cam (154) until gap is eliminated between wear
pad (158) and boom section keeping sections centered
for proper boom alignment.
4.
Install bottom wear pad (80), and shims (79) with
capscrew (69) onto the base of the 3rd stage boom.
NOTE:
Apply multipurpose grease (MPG) to all wear pads
and contact surfaces.
5.
Install two side wear pads (42) and shims (41) onto the
base of the 3rd stage boom. Shim according to
calibration instructions in this section.
NOTE:
Apply multipurpose grease (MPG) to all wear pads
and contact surfaces.
6.
Stretch out 1/2/3 sync extend cable (10), then bring
threaded ends back together to form a loop and find the
center of cable length.
a.
Slide this center loop from front to back through the
cable anchor slot at base, top of the 3rd stage boom
(3).
b.
Slide the keeper sheave (71) into this slot from back
to front so raised portion of sheave slides into slot of
cable anchor plate.
c.
Pull this loop of cable forward to lock 1/2/3 sync
extend cable (10) to 3rd stage boom.
d.
Place the sheave case assembly (44) on top front
of 3rd stage boom with its top bar up and forward.
e.
Loop both threaded ends of sync extend cable (10)
toward back of boom to form two loops, left and
right, at front of boom. Slide left and right loops into
left and right sides of sheave case assembly.
f.
Install bearings (45) in sheaves.
g.
Brush with chassis grease.
h.
Install flattened end pins (47) in sheaves (46).
NOTE:
Insure grease feed holes face toward the back of
the boom.
i.
Slide pins (with sheaves) into slots in front of sheave
case assembly (44). Fold back and position
assembled sheave case on top of boom sections
during assembly of next boom stage.
j.
Route and pull threaded ends of sync extend cable
(10) toward base of boom and loop over base of
boom.
7.
Insure 2nd stage extend cylinder ears (5) are horizontal.
8.
Raise and support 3rd/4th stage booms and install into
2nd stage boom (2) approximately fifteen feet.
NOTE:
Take care to keep 3/2/1 retract cables taunt, not
crossing cables and keeping all cables clear of
pinch points created by slings and bottom pads.
9.
Raise 3rd/4th stage booms against the top of the second
stage boom (2) and install wear pads (17) with capscrew
(167) into the bottom tip of the 2nd stage boom.
NOTE:
Apply multipurpose grease (MPG) to all wear pads
and contact surfaces.
a.
Lower 3rd/4th stage booms onto wear pads (17) in
the 2nd stage boom.
b.
Install 3rd/4th stage booms into 2nd stage boom
leaving approximately four feet of 3rd/4th stage
booms left out of 2nd stage boom.
10.
Assemble 4/3/2 retract cable keeper plate assemblies
(26) with capscrew (27) onto 4/3/2 retract cables (53).
Install double nut (113,12) just beyond flat on 4/3/2
retract cables and assemble at bottom tip of 2nd stage
boom (2).
Reference Only
Summary of Contents for National Crane NBT40 Series
Page 1: ...Service Manual National Crane NBT40 Series R e f e r e n c e O n l y ...
Page 2: ...R e f e r e n c e O n l y ...
Page 216: ...SCHEMATICS NBT40 SERVICE MANUAL 10 2 THIS PAGE BLANK R e f e r e n c e O n l y ...
Page 218: ...NBT40 SERVICE MANUAL APL 2 THIS PAGE BLANK R e f e r e n c e O n l y ...
Page 219: ...R e f e r e n c e O n l y ...
Page 220: ...R e f e r e n c e O n l y ...