![Manitowoc Grove TMS9000-2 Series Service Manual Download Page 207](http://html.mh-extra.com/html/manitowoc/grove-tms9000-2-series/grove-tms9000-2-series_service-manual_701234207.webp)
Grove
Published 01-14-2021 Control # 707-01
5-7
TMS9000-2 SERVICE MANUAL
SUPERSTRUCTURE MAINTENANCE
5
Maintenance Plan M 12: Every 12 Months/
After 1,000 Operating Hours/20 000 - 25 000
km (12,430 - 15,530 mi)
1)
at least once per year
Maintenance and Inspection Plan Y 2:
Every 24 Months/After 100 000 - 125 000 km
(62,150 - 77,800 mi)
Maintenance and Inspection Plan Y 3:
Every 36 Months/After 3,000 Operating
Hours.
Maintenance Work on the SUPERSTRUCTURE:
Every 12 Months/After 1 000 Operating Hours
Main Hoist/Auxiliary Hoist
• Oil change
1)
Check the old oil
Swing Gears
• Oil change, swing gear transmission
• Change the swing gear brake oil
Main Boom
• Check the locking system
Superstructure Air Conditioning System (Additional Equipment)
• Check the entire air conditioning system
Maintenance Work on the SUPERSTRUCTURE:
Every 24 Months
No maintenance work in this period.
The long-term intervals always include the short-term intervals!
Maintenance Work on the SUPERSTRUCTURE:
Every 36 Months/After 3 000 Operating Hours
Main Hoist/Auxiliary Hoist
• Carry out partial inspection; page 4-2
Fo
r
Reference
Only