![Manitowoc Grove GRT8120 Operator'S Manual Download Page 160](http://html.mh-extra.com/html/manitowoc/grove-grt8120/grove-grt8120_operators-manual_701202160.webp)
OPERATING PROCEDURES
GRT8120 OPERATOR MANUAL
4-30
Published 3-22-2021, Control # 702-02
Assignment for Display
The CCS display shows a sectional view of the main boom in
the menus.
The following elements are displayed Figure 4-11:
0
Base section
1
Telescopic section 1
2
Telescopic section 2
3
Telescopic section 3
4
Section locking pin on the telescopic section
5
Cylinder locking pins on the telescoping cylinder
6
Section pin cutouts (holes)
7
Cylinder pin engagement cutouts (holes)
9093
FIGURE 4-11
Summary of Contents for Grove GRT8120
Page 1: ...Operator Manual Grove GRT8120 ...
Page 4: ...THIS PAGE BLANK ...
Page 16: ...TABLE OF CONTENTS GRT8120 A 12 THIS PAGE BLANK ...
Page 24: ...INTRODUCTION GRT8120 OPERATOR MANUAL 1 8 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Page 440: ...GRT8120 OPERATOR MANUAL A 10 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Page 447: ......
Page 448: ......