![Manitowoc GROVE GMK5150L Operating Manual Download Page 864](http://html.mh-extra.com/html/manitowoc/grove-gmk5150l/grove-gmk5150l_operating-manual_701194864.webp)
Rigging work
12.10 Rigging work on the main boom
12 - 116
3 302 709 en
Operating manual
GMK5150L
1
2
.0
1.
201
8
Attaching the
hook block
Depending on the driving mode, you can attach the hook block to the front
bumper;
Before attaching a hook block with ballast
plates to the bumper, you can dismantle the
ballast plates;
H
Do not attach the rope end clamp to the front towing coupling! The towing
coupling must be free for a tow-rod in emergencies.
•
Raise the hook block vertically above the
retaining rope (
1
).
•
Lower the hook block and attach the hook
block to the retaining rope (
1
).
•
Set down the main boom on to the boom
rest and pull the hoist rope tight only to the
extent that the hook block is stabilised in its
position.
H
If the lifting limit switch is deactivated while you tighten the hoist rope,
you can override the shutdown of the lifting limit switch;
G
Risk of accidents if the view is obstructed
The reeved rope lines obstruct the view of the runway. The number of
legally permissible rope lines can vary depending on the country in which
you are working. According to EU regulations, the hook block may be
reeved no more than 4 times when driving on the road.
G
Risk of accidents from the hook block swinging unexpectedly
The hook block will suddenly swing
forward
if the retaining rope for the
hook block tears when tightening the hoist rope.
Therefore ensure that the banksman or other persons always stand at a
safe distance
to the side
of the hook block.
Summary of Contents for GROVE GMK5150L
Page 1: ...Operating manual 3 302 709 en 12 01 2018 ...
Page 6: ...12 01 2018 2 3 302 706 en Additional page GMK Blank page ...
Page 8: ...31 08 2018 2 3 302 808 en Additional pages GMK Blank page ...
Page 12: ...22 11 2018 4 3 302 834 en us Correction sheet GMK5150 GMK5150L Blank page ...
Page 14: ...28 11 2018 2 3 302 839 en Additional pages GMK Blank page ...
Page 16: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Page 18: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Page 20: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Page 24: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Page 30: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Page 32: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Page 36: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Page 42: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Page 45: ...Operating manual 3 302 709 en GMK5150L 12 01 2018 15 15 Index ...
Page 46: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Page 48: ...Overview 1 1 Accidents 1 2 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Page 50: ...Overview 1 4 Terms used 1 4 3 302 709 en Operating manual GMK5150L 12 01 2018 1 4 Terms used ...
Page 52: ...Overview 1 4 Terms used 1 6 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Page 1020: ...Index 15 2 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Page 1039: ......
Page 1040: ......