Crane operation
11.4 Settings and displays for crane operation
Operating manual GMK 6400
3 112 993 en
11 - 107
1
2
.0
7.
201
3
11.4.4
Limiting the power unit speeds
You can enter what percentage of the maximum speed should be enabled
for each power unit.
•
If necessary, open the main menu
ö
and press (
1
) button once
The
Power unit speeds
submenu will open.
Symbols (
1
) or (
2
) for the current operation are
green
.
The values below the green symbols will be
used, e.g. 80% for the main hoist in main
boom operation.
The values for the slewing gear and derricking
gear only apply if they are lower than the auto-
matically limited values. The automatically
limited values are not displayed.
Button (
4
) will only be active if the auxiliary
hoist is connected.
Changing values
•
Repeatedly press, for example, button (
3
)
for the slewing gear until the bar under the
desired value is at (
1
) or (
2
) – input on
To cancel the input – press button (
5
) once.
•
Change the value using switch (
4
)
•
If necessary, change the values for other
power units in the same way
•
Confirm the changed values – press button
(
6
) once. All changed values will be accepted
1
Main boom operation
2
Working with the lattice extension –
button (
3
) active
Summary of Contents for GROVE GMK 6400
Page 1: ...3 112 993 en 12 07 2013 Operating manual Part 1 Driving ...
Page 9: ...Correction sheet GMK6400 3 302 804 en 7 27 08 2018 Hook tackle Reeving A 1x ...
Page 10: ...27 08 2018 8 3 302 804 en Correction sheet GMK6400 Blank page ...
Page 12: ...06 06 2014 2 3 113 115 en Correction sheet GMK6400 Blank page ...
Page 18: ...22 01 2014 6 3 113 060 en Additional page GMK6400 Blank page ...
Page 26: ...3 112 993 en Operating manual GMK 6400 12 07 2013 Blank page ...
Page 28: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 32: ...Overview 1 4 Terms used 1 4 3 112 993 en Operating manual GMK 6400 12 07 2013 1 4 Terms used ...
Page 34: ...Overview 1 4 Terms used 1 6 3 112 993 en Operating manual GMK 6400 12 07 2013 Blank page ...
Page 64: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 76: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 142: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 338: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 383: ...Operating manual GMK 6400 3 112 993 en 12 07 2013 8 8 Index ...
Page 384: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 386: ...Index 8 2 3 112 993 en Operating manual GMK 6400 12 07 2013 Blank page ...
Page 404: ...Index 8 20 3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 405: ......
Page 406: ......
Page 407: ...3 112 993 en 12 07 2013 Operating manual Part 2 Crane operation ...
Page 415: ...Correction sheet GMK6400 3 302 804 en 7 27 08 2018 Hook tackle Reeving A 1x ...
Page 416: ...27 08 2018 8 3 302 804 en Correction sheet GMK6400 Blank page ...
Page 418: ...06 06 2014 2 3 113 115 en Correction sheet GMK6400 Blank page ...
Page 424: ...22 01 2014 6 3 113 060 en Additional page GMK6400 Blank page ...
Page 432: ...3 112 993 en Operating manual GMK 6400 12 07 2013 Blank page ...
Page 434: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 550: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 856: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 868: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 937: ...Operating manual GMK 6400 3 112 993 en 12 07 2013 15 15 Index ...
Page 938: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 940: ...Index 15 2 3 112 993 en Operating manual GMK 6400 12 07 2013 Blank page ...
Page 958: ...Index 15 20 3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 959: ......
Page 960: ......