Crane operation
11.3 Crane operation with main boom
11 - 60
3 112 993 en
Operating manual GMK 6400
1
2
.0
7.
201
3
•
On the RCL, check whether the lamp
II
is
on.
If lamp
II
flashes
, switch over the display;
•
Check whether the current reeving of the auxiliary hoist is displayed,
e.g.
10
. Correct the reeving if necessary;
Lifting and
lowering
You can adjust the sensitivity of the control levers to suit the operating con-
ditions;
Setting the characteristic curves for the control levers
H
The maximum rope speed is continuously decreased automatically from a
degree of utilisation of 80% onwards. Higher speeds are only enabled again
when the degree of utilisation is below 80% and the control lever has been
put in the initial position once.
When the hoist drum is turning, you will notice a pulse on the slewing indi-
cator (
1
).
You can regulate the speed by moving the control lever and changing the
engine speed with the accelerator.
You can set the desired engine speed (idling speed) with the button (
1
);
G
Risk of accident due to gaps in monitoring
Operation of the hoist will only be monitored fully if:
– The lifting limit switch is correctly rigged;
– The lifting limit switch is not overridden;
– The lowering limit switch is correctly set;
G
Risk of accident by suspended loads
Never turn off the engine with a suspended load. You must have the control
levers at hand in order to intervene at any time.
Always set down the load before you leave the crane cab.
Raising:
•
Pull the control lever backwards
Lowering:
•
Push the control lever forwards
Summary of Contents for GROVE GMK 6400
Page 1: ...3 112 993 en 12 07 2013 Operating manual Part 1 Driving ...
Page 9: ...Correction sheet GMK6400 3 302 804 en 7 27 08 2018 Hook tackle Reeving A 1x ...
Page 10: ...27 08 2018 8 3 302 804 en Correction sheet GMK6400 Blank page ...
Page 12: ...06 06 2014 2 3 113 115 en Correction sheet GMK6400 Blank page ...
Page 18: ...22 01 2014 6 3 113 060 en Additional page GMK6400 Blank page ...
Page 26: ...3 112 993 en Operating manual GMK 6400 12 07 2013 Blank page ...
Page 28: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 32: ...Overview 1 4 Terms used 1 4 3 112 993 en Operating manual GMK 6400 12 07 2013 1 4 Terms used ...
Page 34: ...Overview 1 4 Terms used 1 6 3 112 993 en Operating manual GMK 6400 12 07 2013 Blank page ...
Page 64: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 76: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 142: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 338: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 383: ...Operating manual GMK 6400 3 112 993 en 12 07 2013 8 8 Index ...
Page 384: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 386: ...Index 8 2 3 112 993 en Operating manual GMK 6400 12 07 2013 Blank page ...
Page 404: ...Index 8 20 3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 405: ......
Page 406: ......
Page 407: ...3 112 993 en 12 07 2013 Operating manual Part 2 Crane operation ...
Page 415: ...Correction sheet GMK6400 3 302 804 en 7 27 08 2018 Hook tackle Reeving A 1x ...
Page 416: ...27 08 2018 8 3 302 804 en Correction sheet GMK6400 Blank page ...
Page 418: ...06 06 2014 2 3 113 115 en Correction sheet GMK6400 Blank page ...
Page 424: ...22 01 2014 6 3 113 060 en Additional page GMK6400 Blank page ...
Page 432: ...3 112 993 en Operating manual GMK 6400 12 07 2013 Blank page ...
Page 434: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 550: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 856: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 868: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 937: ...Operating manual GMK 6400 3 112 993 en 12 07 2013 15 15 Index ...
Page 938: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 940: ...Index 15 2 3 112 993 en Operating manual GMK 6400 12 07 2013 Blank page ...
Page 958: ...Index 15 20 3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 959: ......
Page 960: ......