Driving modes and rigging for on-road driving
6.5 Installing/removing the supporting box
Operating manual GMK 6400
3 112 993 en
6 - 73
1
2
.0
7.
201
3
6.5.12
Transporting the supporting box on the separate vehicle
•
Check that the outrigger beams are secured against extension during
transportation with the locking pin;
•
Move the outrigger pads into operating position;
•
Load the outrigger box in such a way that no motorists and cyclists are
put at risk.
•
Secure the outrigger box and mounting equipment with holding ropes to
prevent them from falling from the transport vehicle, slipping or damag-
ing other parts.
•
Load the transport vehicle in such a way that the weight is evenly distrib-
uted.
•
Transport the outrigger box only on a separate vehicle of sufficient lifting
capacity;
Dimensions and weights of removable parts
Lashing eyelets
•
Fasten the supporting box for the transport
to the lashing eyelets (
1
) with holding ropes.
S
Risk of damage to add-on parts on the outrigger box and outrigger pads
Always secure the supporting box against slipping and overturning. This
will prevent damage.
G
Risk of accident if used improperly
For transport, attach the supporting box to the provided lashing eyelets
only and only use lifting gear of sufficient lifting capacity.
Summary of Contents for GROVE GMK 6400
Page 1: ...3 112 993 en 12 07 2013 Operating manual Part 1 Driving ...
Page 9: ...Correction sheet GMK6400 3 302 804 en 7 27 08 2018 Hook tackle Reeving A 1x ...
Page 10: ...27 08 2018 8 3 302 804 en Correction sheet GMK6400 Blank page ...
Page 12: ...06 06 2014 2 3 113 115 en Correction sheet GMK6400 Blank page ...
Page 18: ...22 01 2014 6 3 113 060 en Additional page GMK6400 Blank page ...
Page 26: ...3 112 993 en Operating manual GMK 6400 12 07 2013 Blank page ...
Page 28: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 32: ...Overview 1 4 Terms used 1 4 3 112 993 en Operating manual GMK 6400 12 07 2013 1 4 Terms used ...
Page 34: ...Overview 1 4 Terms used 1 6 3 112 993 en Operating manual GMK 6400 12 07 2013 Blank page ...
Page 64: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 76: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 142: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 338: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 383: ...Operating manual GMK 6400 3 112 993 en 12 07 2013 8 8 Index ...
Page 384: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 386: ...Index 8 2 3 112 993 en Operating manual GMK 6400 12 07 2013 Blank page ...
Page 404: ...Index 8 20 3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 405: ......
Page 406: ......
Page 407: ...3 112 993 en 12 07 2013 Operating manual Part 2 Crane operation ...
Page 415: ...Correction sheet GMK6400 3 302 804 en 7 27 08 2018 Hook tackle Reeving A 1x ...
Page 416: ...27 08 2018 8 3 302 804 en Correction sheet GMK6400 Blank page ...
Page 418: ...06 06 2014 2 3 113 115 en Correction sheet GMK6400 Blank page ...
Page 424: ...22 01 2014 6 3 113 060 en Additional page GMK6400 Blank page ...
Page 432: ...3 112 993 en Operating manual GMK 6400 12 07 2013 Blank page ...
Page 434: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 550: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 856: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 868: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 937: ...Operating manual GMK 6400 3 112 993 en 12 07 2013 15 15 Index ...
Page 938: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 940: ...Index 15 2 3 112 993 en Operating manual GMK 6400 12 07 2013 Blank page ...
Page 958: ...Index 15 20 3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 959: ......
Page 960: ......