![Manitowoc Grove GMK 4100L-1 Maintenance Manual Download Page 287](http://html.mh-extra.com/html/manitowoc/grove-gmk-4100l-1/grove-gmk-4100l-1_maintenance-manual_701181287.webp)
Maintenance work on the superstructure
8.8 Hoist ropes
2
5
.1
1.
201
6
Maintenance manual
3 302 364 en
8 - 51
GMK 4100L-1
8.8
Hoist ropes
8.8.1
Checking the winding
Prerequisites
– Video monitoring of the hoists from the crane cab is switched on;
à
Operating Instructions
.
– One hook block must be reeved;
à
Operating Instructions
.
– The main boom must be raised to about 30°;
à
Operating Instructions
.
– The engine must be started.
Checking
Always check the entire length of the winding
of the ropes (
1
).
•
Slowly perform the
lowering
movement until
the rope has moved over the complete
width (
X
) of the rope drum.
– The rope must be evenly wound.
– The rope turns on the drum must
be evenly spaced, 0 to 2 mm
(0 to 0.08 in) apart.
– The cross-over points must be offset
by approximately 180°.
H
The ropes of the top layer lie over the ropes of the bottom layer at the
cross-over points.
D
G
Risk of accidents when the rope drum is turning.
Keep away from the rope drum while it is turning.
This will prevent your limbs from being drawn in and getting crushed.
Summary of Contents for Grove GMK 4100L-1
Page 1: ...Maintenance manual 3 302 364 en 25 11 2016 ...
Page 4: ...24 04 2017 2 3 302 584 en Additional pages for maintenance manual GMK 4100L 1 Blank page ...
Page 12: ...24 04 2017 10 3 302 584 en Additional pages for maintenance manual GMK 4100L 1 Blank page ...
Page 16: ...11 01 2018 2 3 302 704 en Additional page GMK truck cranes Blank page ...
Page 18: ...03 09 2018 2 3 302 809 en Additional pages for maintenance manual GMK truck cranes Blank page ...
Page 20: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 Blank page ...
Page 22: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 30: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 38: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 43: ...25 11 2016 4 Maintenance manual 3 302 364 en GMK 4100L 1 4 Run in regulations ...
Page 44: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 48: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 78: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 88: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 323: ...25 11 2016 9 Maintenance manual 3 302 364 en GMK 4100L 1 9 Longer out of service periods ...
Page 324: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 328: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 332: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 343: ...25 11 2016 Maintenance manual 3 302 364 en GMK 4100L 1 Appendix ...
Page 344: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 345: ...Appendix ...
Page 346: ......
Page 348: ......
Page 350: ......
Page 352: ......
Page 354: ......
Page 355: ......
Page 356: ......