
Reference
Only
SET-UP AND INSTALLATION
2250 MAX-ER 2000 OPERATOR’S MANUAL
4-30
Published 01-08-13, Control # 049-05
FIGURE 4-13
17
9
4
Mast at
75°
Mast at
35°
MAST CAN BE USED AS A BOOM
(See Mast Capabilities for Self-
Assembly and Disassembly.)
View A
View F
3
2
View B
16
1
9
Circled Numbers in Illustrations
Correspond to Numbered Steps
in Lower Mast Procedure.
View D
(left side of crane)
ON
OUT
Remote
Control
P1299
5
7
View E
Equalizer
Spreader
Beam
6
Gantry
Air-Activated Pin
5
8
11
10
19
18
17 or
View C
Pin B
Pin B
Pin A
18
View G
14
13
Link
Boom
Strap
4
6
See
View G
8
9
9
10
10
or
12
11 or 12
15
Stop
Pin
Equalizer
(stored)
Forks
18
Pin C
Pin B
CAUTION
Continuing to boom up after
equalizer is snug in forks will
damage equalizer and/or mast.
Lug for
Pin C
A1152
A1193