7.13.1
Work site and tracks
1
Transport vehicle
2
Construction site
3
Work site within one construction site
4
Travel route between the transport vehicle and
construction site
5
Travel route between work sites within one con-
struction site
6
Travel route between two construction sites
The machine is brought to the construction site on a transport
vehicle. Once the machine has been unloaded and commissioned,
it is moved to the area of the construction site in which it is to be
deployed via a road.
It is put to work as intended in this area of the site and will com-
plete a variety of tasks.
The machine can be moved to a different area of the same con-
struction site, or to another construction site, via a road.
Operation
27.04.2020
140.5.204 Telescopic crane
463
Fo
r
Reference
Only
Summary of Contents for 140.5.204
Page 69: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 69 F o r R e f e r e n c e O n l y ...
Page 70: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 70 F o r R e f e r e n c e O n l y ...
Page 87: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 87 F o r R e f e r e n c e O n l y ...
Page 88: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 88 F o r R e f e r e n c e O n l y ...