6.7.6.4
Folding the heavy-duty jib in transport position
Danger of falling.
–
Do not climb onto the boom or the attachments.
–
Do not climb onto equipment parts (for example, boom
sections, ballast parts) hanging from a crane.
–
Use secure climbing equipment when bolting the attach-
ments.
–
Depending on the work height, use a ladder in accordance
with the applicable standards and regulations.
n
Machine operator
n
Instructed personnel
6.7.6.4.1 Moving the diagonal tie into the park position
There are two ways to move the diagonal tie into the park or
working position in order to fold the heavy-duty jib:
n
With the auxiliary crane
n
With a suitable support
Requirement:
n
Uppercarriage is at 0°.
n
The boom is fully retracted.
n
The boom is fully lowered.
n
The hoisting rope is unreeved.
n
The
Setup attachment
setup mode is set on the SENCON.
L
WARNING
Personnel
Start-up and setup
27.04.2020
140.5.204 Telescopic crane
387
Fo
r
Reference
Only
Summary of Contents for 140.5.204
Page 69: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 69 F o r R e f e r e n c e O n l y ...
Page 70: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 70 F o r R e f e r e n c e O n l y ...
Page 87: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 87 F o r R e f e r e n c e O n l y ...
Page 88: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 88 F o r R e f e r e n c e O n l y ...