
Fig. 28: Diagonal tie in the park position
The diagonal tie is moved into the working position for operating
the machine.
Fig. 29: Diagonal tie in the working position
Chapter 4.1.11 “Heavy-duty jib” on page 125
6.7.6.2
Safe storage location for plugs, cables, and bolts
Removed bolts can be secured in the holders on the heavy-duty jib
until they are ready to be reused.
Further notes
Safe storage location for bolts
Start-up and setup
27.04.2020
140.5.204 Telescopic crane
383
Fo
r
Reference
Only
Summary of Contents for 140.5.204
Page 69: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 69 F o r R e f e r e n c e O n l y ...
Page 70: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 70 F o r R e f e r e n c e O n l y ...
Page 87: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 87 F o r R e f e r e n c e O n l y ...
Page 88: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 88 F o r R e f e r e n c e O n l y ...