ATTACHMENT CONNECTION MANOEUVRES
1 - ATTACHMENT WITHOUT HYDRAULIC CIRCUIT WITH MANUAL LOCK
ENGAGING THE ATTACHMENT
-Check that the attachment is in a position which simplifies the connection to the
carriage. If it is badly positioned, take all the necessary precautions to move it safely.
-Check that the locking pin is engaged in the support (Fig. A).
-Place the telehandler with the boom lowered in front of and parallel to the attachment
and tilt the carriage forward (Fig. B).
-Take the carriage under the connection pipe of the attachment, slightly raise the
boom and tilt the carriage back in order to position the attachment (Fig. C).
-Raise the attachment off the ground for easier engagement.
MANUAL LOCKING
-Take the locking pin from the support (Fig. A) and lock the attachment in place
(Fig. D). Do not forget to fit on the split pin.
MANUAL RELEASE
-Follow the MANUAL LOCKING procedure in reverse order, taking care to replace
the locking pin in its support (Fig. A).
LAYING THE ATTACHMENT
-Follow the ENGAGING THE ATTACHMENT procedure in reverse order, taking care
to lay the attachment flat on the ground and in closed position.
A
B
C
D
6
649100 EN-US-AU (20/05/2019)
MLT 961-145 V PLUS L JD ST4 S1
Summary of Contents for MLT 961-145 V PLUS L JD ST4 S1
Page 5: ...1 1 1 O P E R AT I N G AND SAFET Y INSTRUCTIONS ...
Page 6: ...1 2 649100 EN US AU 20 05 2019 MLT 961 145 V PLUS L JD ST4 S1 ...
Page 7: ...1 3 ...
Page 13: ...1 9 Page intentionally left blank ...
Page 31: ...1 27 ...
Page 37: ...2 1 2 DESCRIPTION ...
Page 38: ...2 2 649100 EN US AU 20 05 2019 MLT 961 145 V PLUS L JD ST4 S1 ...
Page 49: ...2 13 This page is intentionally blank ...
Page 55: ...2 19 LOAD CHART ...
Page 91: ...2 55 This page is intentionally blank ...
Page 109: ...3 1 3 MAINTENANCE ...
Page 123: ...3 15 This page is intentionally blank ...
Page 129: ...3 21 This page is intentionally blank ...
Page 135: ...3 27 This page is intentionally blank ...
Page 145: ...3 37 This page is intentionally blank ...
Page 157: ...4 OPTIONAL ATTACHMENTS FOR USE WITH THE RANGE 4 1 ...
Page 158: ...4 2 649100 EN US AU 20 05 2019 MLT 961 145 V PLUS L JD ST4 S1 ...
Page 160: ...4 4 649100 EN US AU 20 05 2019 MLT 961 145 V PLUS L JD ST4 S1 ...
Page 170: ...14 649100 EN US AU 20 05 2019 MLT 961 145 V PLUS L JD ST4 S1 ...
Page 171: ...5 LOAD CHARTS FOR INTERCHANGEABLE EQUIPMENT ...
Page 173: ...MLT 961 145 V PLUS L JD ST4 S1 ...
Page 174: ...649100 EN US AU 20 05 2019 MLT 961 145 V PLUS L JD ST4 S1 ...
Page 175: ...5 5 MLT 961 104JD ST4 S1 ...
Page 176: ...5 6 IT MLT 961 104JD ST4 S1 649100 EN US AU 20 05 2019 MLT 961 145 V PLUS L JD ST4 S1 ...
Page 177: ...5 7 MLT 961 104JD ST4 S1 ...
Page 178: ...5 8 IT MLT 961 104JD ST4 S1 649100 EN US AU 20 05 2019 MLT 961 145 V PLUS L JD ST4 S1 ...
Page 179: ...5 9 MLT 961 104JD ST4 S1 ...
Page 180: ...5 10 IT MLT 961 104JD ST4 S1 ...