MSD - multi smoke damper
Page 24
Version 2022-12-20
TPM 159/22
X
≥
100
X
1
MSD - design „IB1‟
2
Gypsum wall construction separating FIRST fire compartment from following compartment
3
Ablative Coated Batt (e.g. Firestop Board HILTI CFS-CT B 1S 140/50 - min. density 140 kg/m
3
+ Firestop acrylic sealant HILTI CFS-S ACR or equivalent)
4
Fire stop coating thickness 1 mm (e.g. HILTI CFS-CT, PROMASTOP-CC or equivalent)
5
Fixing profile with threaded rod
6
ROCKWOOL FIREPRO DuctRock Slab th. 90 mm acc. to EN 1366-8
7
ROCKWOOL FIREPRO Glue
FIRST
FIRE COMPARTMENT
IN DIRECTION OF
EXHAUST HEAT AND
SMOKE
Following duct
SINGLE
acc. to
EN 1366-9
Connection detail
FLOW DIRECTION
(only applies for s
moke extraction)
SECOND
FIRE COMPARTMENT IN
DIRECTION OF
EXHAUST HEAT AND
SMOKE
Dividing construction between SINGLE / MULTI duct - insulation with ROCKWOOL FIREPRO - Ablative Coated Batt
EIS 90
Following duct
MULTI
acc. to
EN 1366-8
Connection detail