Fire damper - FDMQ
Page 60
Version 2023-07-27
TPM 103/14
EIS 90
B
B+109
+3
(installation opening)
B+124
A
A
+
1
0
9
+
3
(i
n
s
ta
lla
ti
o
n
o
p
e
n
in
g
)
A
+
1
2
4
A(B)+109
+3
(installation opening)
≥
1
1
0
*
Side A
Number of
brackets
ZA
Side B
Number of
brackets
ZB
A ≤ 500
4
B ≤ 500
0
500 < A ≤ 1000
6
500 < B ≤ 800
4
1000 < A ≤ 1500
8
Number of brackets X = ZA + ZB
Number of screws Y = 2 x X
■
For connection of following duct
■
Installation frame can be installed on the damper or delivered separately
Solid ceiling construction - installation frame E1
* min. 110 mm - Concrete
min. 125 mm - Aerated concrete
1
FDMQ
2
Installation frame
3
Bracket with fasteners (delivered with frame)
4
Fill the gaps with glue PROMAT K84
5
Duct
6
Profile with threaded rod
7
Solid ceiling construction