FDMB - Fire damper
Page 30
Version 2022-12-20
TPM 164/22
Installation outside gypsum wall construction
Outside gypsum wall construction - ISOVER Ultimate Protect - Ablative Coated Batt
■
For connection following duct
■
Minimum and maximum distance between the wall and fire damper when installation remote from the wall is unlimited.
■
When installing the insulation, follow the ISOVER manufacturer's instructions.
■
The dampers and duct must be suspended separately.
■
The duct must be suspended on both sides of damper after national rules.
■
Duct between fire damper and fire separating construction must be suspended by using threaded rods and mounting profiles, or another
anchoring system according national standards.
■
The dampers inspection holes are covered by insulation and therefore it's necessary to make an inspection hole on the connecting duct.
■
Load the suspension system depend on weight of the fire damper and duct system
■
Max. length between two suspension systems is 1500 mm.
■
Damper assembly procedures must be done so as all load transfer from the fire separating constructions to the damper body is absolutely excluded.
■
If the threaded rod is located inside the duct insulation, distance between threaded rod and duct is max 30 mm.
■
If the threaded rod is located outside the duct isolation, distance between threaded rod and isolation is max. 40 mm.
■
The insulation boards are fastened to the duct.
■
Reinforcing frame VRM2-B must be used for this kind of installation always. VRM2-B is not a part of the Fire damper and must be ordered
separately for each installation case!
1
FDMB
2
Gypsum wall construction
3
Ablative Coated Batt (e.g. Firestop Board HILTI CFS-CT B 1S 140/50 - min.
density 140 kg/m
3
+ Firestop acrylic sealant HILTI CFS-S ACR or equivalent)
4
Fire stop coating thickness 1 mm (e.g. HILTI CFS-CT, PROMASTOP-CC or
equivalent)
5
Insulation board made of stone wool, with a surface treatment of
aluminum foil, min. density 66 kg/m³ (ISOVER Ultimate Protect SLAB 4.0
Alu1, th. 60 mm)
6
Standard air ducts, made of galvanized sheet thickness 0,8 mm, flanges
30 mm, acc. to EN 1507 and DIN 24190
7
ISOVER Protect BSK glue - apply on the insulation and stick it to the fire
separation construction
8
Fire resistant mastic - fill the gap on both sides of the fire separation
construction and around the perimeter of penetration and damper
body. (e.g. HILTI CFS-S ACR)
9
Fixing profile with threaded rod
10
Duct penetration insulation collar - ISOVER Ultimate Protect SLAB 4.0
Alu1, th. 60 mm - glued (pos. 7) and fixed with screws to the wall
construction
11
Insulating collar of the damper and duct connection - ISOVER Ultimate
Protect SLAB 4.0 Alu1, th. 60 mm
12
L-profile 30x30x3 mm - dimensions and installation acc. to ISOVER
manufacturer
13
Stud-welded pins 60 mm - quantity and placing acc. to ISOVER manufa.
14
Stud-welded pins 120 mm - quantity and placing acc. to ISOVER manufa.
15
Stud-welded pins 180 mm - quantity and placing acc. to ISOVER manufa.
16
Fire spiral shaped screws - quantity and placing acc. to ISOVER manufa.
17
Steel clamp min. M8 bolts
18
ISOVER Protect BSF
19
≥
100
(continued on next page)
EIS 90