MANDÍK CPV Installation, commissioning, and maintenance
IZU 02/2021
MANDÍK, a.s., www.mandik.cz
R
30
ATTENTION:
ALL ROTATING PARTS (FANS, ETC.) MUST HAVE STOPPED MOVING BEFORE
ENTERING INTO THE EQUIPMENT!
•
ATTENTION:
ELECTRIC HEATERS, HEAT EXCHANGERS AND HYDRAULIC SYSTEM
COMPONENTS MUST BE COOLED DOWN TO AMBIENT TEMPERATURE, MEANING A
MAXIMUM SURFACE TEMPERATURE OF +
40°C!
•
ATTENTION:
PRESSURE IN ALL PRESSURISED SYSTEMS MUST BE EQUALISED TO THE
AMBIENT PRESSURE!
9.4
MAINTENANCE AND SERVICE INTERVALS
Detailed operating instructions and maintenance and service procedures are provided in the
following paragraphs 9.5 and the individual parts of the unit.
1
3
6
12
1. UNIT IN GENERAL
1.01.
N
cleaning and
repair
1.02.
Y
repair
1.03.
Y
repair
1.04.
Y
repair
1.05.
Y
measuring
1.06.
1.07.
* status of unit operation while performing the checks
SERVICING AND MAINTENANCE OPERATIONS
Unit in
operation
Y/N *
Check operation
Overa l l check of cl ea ni ng, da ma ge a nd corros i on
on a l l components of the uni t (outs i de/i ns i de).
Check the air output of the unit (when the unit
and filters are clean inside).
Check the unit for excessive vibrations.
Overall check of the tightness of the doors,
service and fixed panels on all components of
the unit.
Service/rectificati
on method
Check the tightness of the connections of HVAC
ducts and the condition of the damping inserts.
Intervals (months)