FLOOR LEVELING AND PLACEMENT
1.
Place provided 4' level in desired location. Ensure that there are
no gaps between the bottom of the level and the floor that are
greater than 1/8", and that the site is level (the indicating bubble
on the level should be between the center marks).
2.
Place Floor Pan in desired pod location.
3.
Push down on Floor Pan at red arrow locations.
The Floor Pan should be stable and not rock.
4.
Place provided 4' Level in Floor Pan slots as shown and ensure
that the floor pan is level.
Page 5
4' LEVEL
**Note: If there's rocking, move the Floor Pan
a short distance to find a more stable location.
**Note: If the floor is not level, move the Floor Pan
a short distance to find a more stable location.
Summary of Contents for Solo
Page 2: ...Page 2...