8
|
NOTES TO THE
INSTRUCTION MANUAL
PICTOGR AMS / SYMBOLS
The following instructions and guidelines in this instruction man-
ual are intended for care staff or other persons and staff tasked
with operating and using the hospital bed.
The instruction manual must be accessible to per-
sonnel at all times to avoid operating errors and to
guarantee fault-free operation. The care staff must
have a good understanding of the hospital beds and
be trained in their operation before using them for
the first time. The instruction manual must be used
for this training.
This instruction manual has been written for the IMPULSE KL
hospital bed. The images, graphics and texts it contains may differ
from the equipment supplied.
The manufacturer offers technician training for
maintenance and servicing work on their hospital
beds. A certificate obtained as part of this training
authorises the holder to carry out technical work
independently on the beds.
For better orientation, this instruction manual uses the picto-
grams described below.
Important!
Instructions labelled in this way must be strictly ob-
served in order to avoid injury or damage!
Information!
This pictogram identifies information relating to the
current subject!
Summary of Contents for IMPULSE KL
Page 1: ...CLINIC DESIGN IMPULSE KL INSTRUCTION MANUAL HOSPITAL BED...
Page 2: ...2...
Page 13: ...13...
Page 31: ...31...
Page 33: ...33 GS side rail dimensions When using the ABS metal lattice sleeping surface 378 114 85...
Page 36: ...36 VGS side rail dimensions When using the ABS metal lattice sleeping surface 368 115 85...
Page 41: ...41...
Page 62: ...62 Notes...
Page 63: ...63 Notes...