background image

V0 

Cold Tap 

Installation Guide 

 

IMPORTANT!

   

Please read the 

instructions carefully before installation.

 

All pipe work must be thoroughly flushed 
prior to installation 

– failure to do this will 

result in foreign materials blocking the flow 
regulating device and reduce the flow.       

Do not conduct hydrostatic test once the tap 
has been fitted 

– doing this will cause 

damage to the ceramic cartridge. 

Isolating stop valve is recommended to be 
fitted to water supply connection for ease of 
maintenance. 

1. Installation

IMPORTANT!    Before installation; 

Flush through the pipe work to ensure removal of debris.  
Turn off the water mains and close any isolating valves. 

Ensure the mounting surface is clean. 

1.1 Installing the tap to the mounting deck 

Requirements;  
Mounting deck - with single 28mm diameter tap hole 
and thickness of not more than 40mm.   Refer Diagram 1. 
Tools - battery operated power drill (minimum torque 

265 in.lb.) fitted with ‘Phillips’ bit. Refer Diagram 2. 

Step1 - Place the Top Mount Mechanism over the 
tap hole

   

  IMPORTANT!    Do not dismantle the inlet 

hose prior to installation! 

Remove the preassembled

tap from its box. 

While holding up the Tap Body

 in one hand, use

your other hand to insert the flexible Inlet Hose

 

through the mounting deck hole. Do this by first 

inserting Inlet Hose Nut

, followed by Nylon Nut 

Sleeve

Next insert the Clamp Plate

. To facilitate a

 

smooth entry, lift up the clamp plate and press it

 

toward the inlet hoses. Refer Diagram 4. 

Diagram 1

 

Diagram 3 

Diagram 4

  2 

Diagram 2

 

Check that the inlet hoses have been tightly screwed in 

to the mixer base. This is important to prevent the 

possibility of leaking and damage to your cabinets. 

(The 

hoses have been properly fitted and checked for water 
tightness at the factory. However 

they may become 

loose during transportation or handling.)

Reviews: