
Page
15
of
37
3.2.6a Hook Operation
Front on Hook Engagement
Side on Hook Engagement
Removing a hook is a two-stage process-
1. Lift the handles to take load off the hook
2. Guide the hook back out of the lifting eye by laterally
manipulating the handles
Hook naturally springs back to
this position to enable convenient
entry and exit from lifting eye
When the hook is loaded it
straightens allowing the load to sit
in the deepest part of the hook.
The hook rotates through 360° so
it can lift side on as well as front
on as illustrated above
•
Hook operation is designed to enable one-man hook engagement and disengagement in a
fixed lifting point.
•
For flexible lift point such as a sling, the hooks self-locking mechanism engages as load is
applied. Hence aiding single man operation.
•
Second person should stay clear of the lift operator by 4m while load is not supported by
ground or elevated platform.
Summary of Contents for PHT2-140
Page 1: ...Rev 0919...
Page 32: ...Page 32 of 37 9 CHARGER SPECIFICATIONS 3A...
Page 37: ...Page 37 of 37...