
completed by the installer. The relevant section of Building Regulations only relates to dwellings. Therefore the checklist only applies if the appliance is being
installed in a dwelling or some related structure.
The flowchart
gives guidance for installers on the process necessary to ensure compliance with Building Regulations.
Natural Gas
Main 12 Heat ErP
G.C.No 41-467-23
Main 15 Heat ErP
G.C.No 41-467-24
Main 18 Heat ErP
G.C.No 41-467-25
Main 24 Heat ErP
G.C.No 41-467-26
Main 30 Heat ErP
G.C.No 41-467-27
The Benchmark Scheme
Benchmark places responsibilities on both manufacturers and installers. The purpose is to ensure that customers are provided with the correct equipment for
their needs, that it is installed, commissioned and serviced in accordance with the manufacturer's instructions by competent persons and that it meets the
requirements of the appropriate Building Regulations. The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and
should be provided to the customer for future reference.
Installers are required to carry out installation, commissioning and servicing work in accordance with the Benchmark Code of Practice which is available from
the Heating and Hotwater Industry Council who manage and promote the Scheme. Visit
www.centralheating.co.uk
for more information.
© Baxi Heating UK Ltd 2015
All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, or stored in any
retrieval system of any nature (including in any database), in each case whether electronic, mechanical, recording or otherwise, without the prior written
permission of the copyright owner, except for permitted fair dealing under Copyrights, Designs and Patents Act 1988.
Applications for the copyright owner's permission to reproduce or make other use of any part of this publication should be made, giving details of the
proposed use, to the following address:
The Company Secretary, Baxi Heating UK Ltd,
Brooks House, Coventry Road, Warwick. CV34 4 LL
Full acknowledgement of author and source must be given.
WARNING
: Any person who does any unauthorised act in relation to a copyright work may be liable to criminal prosecution and civil claims for damages.
page 2
Installer Notification Guidelines
Summary of Contents for Main Heat 12
Page 8: ...Fig 3 Fig 4 Fig 5 Fig 6...
Page 38: ...Example 1 Example 2 Example 3...
Page 40: ...Fig E Fig F...
Page 51: ...Fig 31 Fig 32 Fig 33...
Page 55: ...Fig 35 Fig 36 page 39 12 2 Checking the Combustion 1 Follow the flow chart opposite...
Page 56: ......
Page 63: ...Fig 45 Fig 46...
Page 66: ......
Page 69: ...Fig 55 Fig 56 Fig 57 Fig 58...
Page 72: ...page 52...
Page 74: ...page 54...
Page 75: ...DRY FIRE...
Page 76: ...page 55 IGNITION LOCKOUT...
Page 77: ...page 56 OVERHEAT LOCKOUT...
Page 78: ...page 57 FAN LOCKOUT NOTE The fan is supplied with 325 Vdc...
Page 80: ...warranty This does not affect the customer s statutory rights page 62...
Page 82: ...page 63...