
VENTILATOREN
FR
MDR .. EC
FIG
UK
DE
the plug of the cable screw connections
[10] and open it according to the thickness
of the earth conductor. Lead the earth con
-
ductor from below through the cable screw
connections [10] and grommet [15] up to
the stud bolt [16]. Close the cable screw
connection [10].
NOTICE:
Ensure tightness –
otherwise moisture and risk of corrosion.
4. Connect flexible sleeve to the folded
spiral-seams duct.
NOTICE:
Ensure seal
integrity. For
MDR-PG variants
do not kink
tubes.
5. Screw the MDR roof flashing to the flat
roof (Fig. B, position [X]). Provide suitable
mounting material (4 screws, tightening
torque 20 Nm).
6. Complete
"external earthing connection"
(Fig D). The required mounting material is
located on the stud bolts [16] Provide the
earth conductor with a cable lug (provided
by customer) and screw the earth con
-
ductor to the stud bolt [16].
NOTICE:
For a
secure contact, place the tooth lock washer
under the cable lug, place the washer over
the cable lug and tighten with the lock nut
Summary of Contents for MDR 22 EC
Page 2: ...VENTILATOREN FR MDR EC FIG UK DE...
Page 3: ...VENTILATOREN FR MDR EC FIG UK DE...
Page 4: ...VENTILATOREN FR MDR EC FIG UK DE...
Page 5: ...VENTILATOREN FR MDR EC FIG UK DE...
Page 6: ...VENTILATOREN FR MDR EC FIG UK DE...
Page 7: ...VENTILATOREN FR MDR EC FIG UK DE...
Page 177: ...VENTILATOREN FR MDR EC FIG UK DE 7185 1244 0000_MOB_RLF 8_08 20_DSW...