
VENTILATOREN
FR
MDR .. EC
FIG
UK
DE
8 Mounting information
●
Observe the permissible load capacity of the
roof (min. 200 kg/m²).
●
Lay connecting cables (ventilation duct, pow
-
er cable, control cable) at the installation site.
●
The customer must provide suitable mount
-
ing material (strength class 8.8) which is suffi
-
ciently dimensioned to support the basic unit.
●
To avoid sound bridges with the structure,
observe distances from other façade compo
-
nents. If necessary, use isolating elements.
●
If an earthing connection is provided, lay an
earth conductor to the installation site. Allow
sufficient cable length into the MDR housing.
Alternatively, the earthing connection can
also be made on the outside of the roof flash
-
ing [6]. For MDR-PG and MDR-VG variants,
the earthing strap is included in delivery and
already pre-assembled.
●
If the electrical connecting cables are fed
through the empty conduits into the terminal
box, cables with excessively large cross-sec
-
tions can get stuck in the elbow [13]. Observe
Summary of Contents for MDR 22 EC
Page 2: ...VENTILATOREN FR MDR EC FIG UK DE...
Page 3: ...VENTILATOREN FR MDR EC FIG UK DE...
Page 4: ...VENTILATOREN FR MDR EC FIG UK DE...
Page 5: ...VENTILATOREN FR MDR EC FIG UK DE...
Page 6: ...VENTILATOREN FR MDR EC FIG UK DE...
Page 7: ...VENTILATOREN FR MDR EC FIG UK DE...
Page 177: ...VENTILATOREN FR MDR EC FIG UK DE 7185 1244 0000_MOB_RLF 8_08 20_DSW...