Maico ERK 100 Mounting And Operating Instructions Download Page 9

en 

 8. Installation 

 Electrical connection 

 

 

 

NOTICE 

Danger of short-circuits and 
damage to the unit. 
Water/dampness may 
penetrate the terminal box if 
the power cable is 
introduced incorrectly 
(leaking) or if the cable 
grommet is not fitted 
correctly. 
Pierce cable grommet such 
that it can fully surround the 
power cable and makes close 
contact in the terminal box. 

 

3.  Pierce cable grommet [8] in terminal box 

with a nozzle pin. 

4.  Guide the power cable into the terminal 

box such that the cable grommet fits 
around the cable sheathing completely.  
If necessary, seal the cable grommet on-
site. 

5.  Wire fan to the terminal block according to 

the wiring diagram (

 chapter 13). Note 

the screws' tightening torque of 0.7 Nm. 

6.  Secure power cable with tension relief [7] 

to ensure that the power cable is seated 
firmly. 

 

7.  On ERK .. T units, set the unit overrun 

time with potentiometer [9] (setting range 3 
to 15 minutes). 

8.  Fit optional on/off switch. 

9.  Connect other optional accessory 

components (

 chapters 8.3 and 8.4). 

 

NOTICE 

Unit damage due to moisture 
in the event of improperly 
attached terminal box cover. 
1.  The terminal box cover 

sealing must be flush all the 
way round the terminal box. 

2.  Tighten screws to a tightening 

torque of 1.0 Nm. 

10.  Fit terminal box cover. 

 

8.3 Speed control with speed 
controller 

ERK units (other than ERK .. T units) can be 
controlled in an infinitely variable manner 
using a speed controller appropriate to the 
unit type (

 online, 

 catalogue). 

 

The technology used in the phase 
angle controller may cause humming 
noises. 

 

NOTICE 

The fan will stop and suffer 
functional problems if the 
output voltage on the speed 
controller is too low. 
1.  Observe information in the 

speed controller operating 
instructions. 

2.  Always set the minimum 

speed on the speed controller 
such that the fan motor starts 
up again after power failure. 

 

i

Summary of Contents for ERK 100

Page 1: ...Duct fans ERK 100 ERK 100 T ERK 100 S ERK 100 ST ERK 125 ERK 125 T ERK 150 ERK 160 ERK 200 Mounting and operating instructions www m aico ventilatoren c om VENTILATOREN...

Page 2: ...peed control with speed controller 9 8 4 Operation with step transformer 10 8 5 Commissioning 10 9 Maintenance 10 10 Fault rectification 10 11 Dismantling 12 12 Disposal 12 13 Wiring diagrams 12 Addit...

Page 3: ...g fastening material 4 fastening screws and 4 dowels in the terminal box Mounting and operating instructions 2 General notes Read these installation and operating instructions carefully before using t...

Page 4: ...50 DN 160 or DN 200 ERK 100 T ERK 125 T like ERK also with follow up relay timer adjustable from 3 to 15 minutes Units with nominal size of DN 100 or DN 125 ERK 100 S ERK 100 ST Duct fans with guide v...

Page 5: ...e permitted for the duct The ERK fan must be permanently installed and the electrical supply cable permanently laid A mounting foot 5 should be used for installation The mounting location must demonst...

Page 6: ...itionally a mains isolation device with contact openings of at least 3 mm at each pole must be installed Only operate the unit when it is completely installed Ensure that foreign bodies cannot be suck...

Page 7: ...ly store fan horizontally in a suitable dry room ambient temperature 10 to 60 C Before installing check that the motor bearing is working properly Maico accepts no liability for corrosion damage cause...

Page 8: ...ctly in the clamp grooves in order to prevent leakages 5 Fit suitable insulation sound deadening and installation material 8 2 Electrical connection DANGER Danger to life from electric shock Prior to...

Page 9: ...T units set the unit overrun time with potentiometer 9 setting range 3 to 15 minutes 8 Fit optional on off switch 9 Connect other optional accessory components chapters 8 3 and 8 4 NOTICE Unit damage...

Page 10: ...lt Repairs should only be carried out by a trained electrician DANGER Danger to life from electric shock Prior to accessing the connection terminals switch off all supply circuits Switch off the mains...

Page 11: ...If the fault still continues or occurs again disconnect the fan from the power supply at all poles Let a certified electrician determine the cause of the fault and eliminate it i...

Page 12: ...rning sign 1 Switch off mains fuse secure and fit warning sign 2 Remove folded spiral seam ducts from fan 3 Remove the terminal box cover 4 Remove all cables 5 Remove fan 12 Disposal Do not dispose of...

Page 13: ...13 Wiring diagrams en 13 ERK 100 T ERK 100 ST ERK 125 T ERK 200...

Page 14: ...de gb Maico Elektroapparate Fabrik GmbH Steinbeisstr 20 78056 Villingen Schwenningen Germany Service 49 0 7720 694 447 technik maico de 07 14_Es 0185 1173 0000_RLF 4_07 14_DSW...

Reviews: