8. Installation 

 Electrical connection 

 en 

 

8. Mounting 

8.1 Installing fan 

 

CAUTION 

Danger from incorrect 
installation location or incorrect 
attachment. 
1.  Only fit in places with sufficient 

load-bearing capacity. 

2.  If necessary, the customer 

should provide fastening 
material suitable for the 
installation location. 

 

1.  Remove pre-installed mounting foot [5] by 

opening both clamps and taking out fan 
housing [1] and connection sockets [2]. 

2.  Fit mounting foot [5] at installation location 

using appropriate fastening material. 

 

Make sure that there is free access 
to terminal box [3]. 

3.  Slide folded spiral-seam ducts suitable for 

the diameter of the connection sockets 
onto the two connection sockets on the 
inlet and outlet sides. If necessary, first 
attach flexible fixing cuffs onto connection 
sockets. 

4.  Insert fan housing and two connection 

sockets in grooves of the two clamps. 
Close the clamps and screw down. 

 

Ensure that the components do not 
twist and are inserted correctly in the 
clamp grooves in order to prevent 
leakages. 

5.  Fit suitable insulation, sound-deadening 

and installation material. 

 

 

 

 

 

 

 

8.2 Electrical connection 

 

DANGER 

Danger to life from electric 
shock. 
Prior to accessing the 
connection terminals, switch off 
all supply circuits. Switch off 
mains fuse, secure against 
being accidentally switched back 
on and position a visible warning 
sign. 

 

NOTICE 

Risk of damage to unit in the 
event of short-circuits. 
Insulate any unnecessary cable 
cores. 

 

 

 

Information 

  ERK fans are not approved for 

operation with frequency converters. 

  Speed can be controlled using a speed 

controller (phase angle) or step 
transformer. For speed controller  

 accessories online or valid Maico 

catalogue. 

  Units with ERK 100 T, ERK 100 ST and 

ERK 125 T timers  have an extra PCB with 
potentiometer in the terminal box. This can 
be used to set the follow-up relay (timer) 
from 3 to 15 minutes.  
The speed of timer units cannot be 
controlled. 

  The high performance level should be 

connected when using speed 
controllers/transformers. 

 

 

1.  Switch off mains fuse and prevent from 

being started up again. Attach warning 
sign. 

2.  Remove terminal box cover [4] and 

accessories bag. 

i

i

i

Summary of Contents for ERK 100

Page 1: ...Duct fans ERK 100 ERK 100 T ERK 100 S ERK 100 ST ERK 125 ERK 125 T ERK 150 ERK 160 ERK 200 Mounting and operating instructions www m aico ventilatoren c om VENTILATOREN...

Page 2: ...peed control with speed controller 9 8 4 Operation with step transformer 10 8 5 Commissioning 10 9 Maintenance 10 10 Fault rectification 10 11 Dismantling 12 12 Disposal 12 13 Wiring diagrams 12 Addit...

Page 3: ...g fastening material 4 fastening screws and 4 dowels in the terminal box Mounting and operating instructions 2 General notes Read these installation and operating instructions carefully before using t...

Page 4: ...50 DN 160 or DN 200 ERK 100 T ERK 125 T like ERK also with follow up relay timer adjustable from 3 to 15 minutes Units with nominal size of DN 100 or DN 125 ERK 100 S ERK 100 ST Duct fans with guide v...

Page 5: ...e permitted for the duct The ERK fan must be permanently installed and the electrical supply cable permanently laid A mounting foot 5 should be used for installation The mounting location must demonst...

Page 6: ...itionally a mains isolation device with contact openings of at least 3 mm at each pole must be installed Only operate the unit when it is completely installed Ensure that foreign bodies cannot be suck...

Page 7: ...ly store fan horizontally in a suitable dry room ambient temperature 10 to 60 C Before installing check that the motor bearing is working properly Maico accepts no liability for corrosion damage cause...

Page 8: ...ctly in the clamp grooves in order to prevent leakages 5 Fit suitable insulation sound deadening and installation material 8 2 Electrical connection DANGER Danger to life from electric shock Prior to...

Page 9: ...T units set the unit overrun time with potentiometer 9 setting range 3 to 15 minutes 8 Fit optional on off switch 9 Connect other optional accessory components chapters 8 3 and 8 4 NOTICE Unit damage...

Page 10: ...lt Repairs should only be carried out by a trained electrician DANGER Danger to life from electric shock Prior to accessing the connection terminals switch off all supply circuits Switch off the mains...

Page 11: ...If the fault still continues or occurs again disconnect the fan from the power supply at all poles Let a certified electrician determine the cause of the fault and eliminate it i...

Page 12: ...rning sign 1 Switch off mains fuse secure and fit warning sign 2 Remove folded spiral seam ducts from fan 3 Remove the terminal box cover 4 Remove all cables 5 Remove fan 12 Disposal Do not dispose of...

Page 13: ...13 Wiring diagrams en 13 ERK 100 T ERK 100 ST ERK 125 T ERK 200...

Page 14: ...de gb Maico Elektroapparate Fabrik GmbH Steinbeisstr 20 78056 Villingen Schwenningen Germany Service 49 0 7720 694 447 technik maico de 07 14_Es 0185 1173 0000_RLF 4_07 14_DSW...

Reviews: