5. Safety instructions 

 en 

 

5. Safety instructions 

 

5.1 General 

 Read these operating 

instructions carefully before 
mounting and commissioning. 

 Assembly and electrical 

connection may only be 
undertaken by trained 
specialists in accordance with 
Chapter 2. 

 The unit may only be 

operated using the voltage 
and frequency shown on the 
rating plate. 

 The degree of protection 

stated on the rating plate is 
only guaranteed if installation 
is undertaken correctly and if 
the cables are correctly 
guided into the terminal box. 

 Only connect unit to 

permanently wired electrical 
installations with NYM-O or 
NYM-J, (3 x 1.5 mm²) cables. 
Additionally, a mains isolation 
device with contact openings 
of at least 3 mm at each pole 
must be installed. 

 Only operate the unit when it 

is completely installed. 

 Ensure that foreign bodies 

cannot be sucked into the unit 
and duct. 

 Never operate the device 

without a protective grille 
(Maico SGR) with a free 
inlet/outlet. The impeller must 
have protection against 
accidental contact (EN ISO 
13857). 

 Ensure a sufficient supply air 

intake. 

 Modifications and alterations 

to the unit are not permitted 
and release the manufacturer 
from any guarantee and 
liability. 

 

5.2 Safe and correct practices 
during operation 

Danger of injury from 
objects in the impeller. 
Do not insert any objects  
in the unit. 

 

Danger of injury from 
rotating impeller. Do not 
get too close to the unit, 
to avoid hair, clothing or 
jewellery being drawn into 
the unit. 
 

Summary of Contents for ERK 100

Page 1: ...Duct fans ERK 100 ERK 100 T ERK 100 S ERK 100 ST ERK 125 ERK 125 T ERK 150 ERK 160 ERK 200 Mounting and operating instructions www m aico ventilatoren c om VENTILATOREN...

Page 2: ...peed control with speed controller 9 8 4 Operation with step transformer 10 8 5 Commissioning 10 9 Maintenance 10 10 Fault rectification 10 11 Dismantling 12 12 Disposal 12 13 Wiring diagrams 12 Addit...

Page 3: ...g fastening material 4 fastening screws and 4 dowels in the terminal box Mounting and operating instructions 2 General notes Read these installation and operating instructions carefully before using t...

Page 4: ...50 DN 160 or DN 200 ERK 100 T ERK 125 T like ERK also with follow up relay timer adjustable from 3 to 15 minutes Units with nominal size of DN 100 or DN 125 ERK 100 S ERK 100 ST Duct fans with guide v...

Page 5: ...e permitted for the duct The ERK fan must be permanently installed and the electrical supply cable permanently laid A mounting foot 5 should be used for installation The mounting location must demonst...

Page 6: ...itionally a mains isolation device with contact openings of at least 3 mm at each pole must be installed Only operate the unit when it is completely installed Ensure that foreign bodies cannot be suck...

Page 7: ...ly store fan horizontally in a suitable dry room ambient temperature 10 to 60 C Before installing check that the motor bearing is working properly Maico accepts no liability for corrosion damage cause...

Page 8: ...ctly in the clamp grooves in order to prevent leakages 5 Fit suitable insulation sound deadening and installation material 8 2 Electrical connection DANGER Danger to life from electric shock Prior to...

Page 9: ...T units set the unit overrun time with potentiometer 9 setting range 3 to 15 minutes 8 Fit optional on off switch 9 Connect other optional accessory components chapters 8 3 and 8 4 NOTICE Unit damage...

Page 10: ...lt Repairs should only be carried out by a trained electrician DANGER Danger to life from electric shock Prior to accessing the connection terminals switch off all supply circuits Switch off the mains...

Page 11: ...If the fault still continues or occurs again disconnect the fan from the power supply at all poles Let a certified electrician determine the cause of the fault and eliminate it i...

Page 12: ...rning sign 1 Switch off mains fuse secure and fit warning sign 2 Remove folded spiral seam ducts from fan 3 Remove the terminal box cover 4 Remove all cables 5 Remove fan 12 Disposal Do not dispose of...

Page 13: ...13 Wiring diagrams en 13 ERK 100 T ERK 100 ST ERK 125 T ERK 200...

Page 14: ...de gb Maico Elektroapparate Fabrik GmbH Steinbeisstr 20 78056 Villingen Schwenningen Germany Service 49 0 7720 694 447 technik maico de 07 14_Es 0185 1173 0000_RLF 4_07 14_DSW...

Reviews: