
EN
│
7. Installation
18
ECA 100 ipro
standard model
units
can be operated at two levels with
double switches. Without a double
switch, the fan can either be opera-
ted at performance level 1 or perfor-
mance level 2, see switch variants in
Chapter 13.
4. Check position of cable grommet. It must
be well sealed.
7.3 Operating programs
●
VZC, KVZC, F, KF, B and KB:
One of the
4 following operating programs can be set
with jumpers J4 and J5.
●
H and KH:
One of the 4 following opera-
ting programs can be set with jumpers J4
and J5 and the light switch connected in
accordance with chapter 13. If this is
switched on, it takes priority over the
automatic humidity process.
●
Comfort program (supplied in this mode),
night program, economy program and
power program.
1. Set the operating program you want with
jumpers J4 and J5.
Comfort program
●
Performance level 1 while room is being
used, performance level 2 during overrun
time.
●
J4 bridged, J5 bridged
Night program
●
Performance level 2 while room is being
used, performance level 1 during overrun
time.
●
J4 open, J5 open
Economy program
●
Performance level 1 during operation and
overrun.
●
J4 open, J5 bridged
Power program
●
Performance level 2 during operation and
overrun.
●
J4 bridged, J5 open
Summary of Contents for ECA 100 ipro VZC
Page 3: ...A B C...