
7. Installation
│
EN
19
2. Fit electronics cover.
NOTICE
Danger of short circuits and
damage to unit! Humidity will
penetrate if electronics cover
is not used correctly.
Press electronics cover firmly
onto housing such that it is
sealed and flush all the way
around. Do not press setting
buttons [11] and [12].
3. Insert electronics cover into housing
recesses
I, II
and
III
with the 3 latches
until they snap into place. Press the
electronics cover firmly on to the housing
at the points indicated by the arrows.
4. For unit versions F, KF, H, KH, B and KB,
insert the sensor supplied [9] in the correct
position (
arrow X) in the connector
base.
5. Fit cover [6].
6. Set start delay and overrun time in
accordance with Chapter 7.5.
7. Fit designer cover [7] (
fold out page,
Fig. B).
7.4 Start-up
1. Switch the mains fuse on.
2. Carry out a function test.
7.5 Start delay and overrun time
When the setting button is pressed
for the first time, the value currently
set is displayed. The LEDs are off
during operation.
For condition in which unit is
supplied,
table in Chapter 2.1.
1. Remove designer cover [7] carefully
(
fold out page, Fig. B).
2. Set start delay:
Press setting button [11] until the LED for
the start delay time you want lights up.
Wait until the LED flashes twice and goes
out. The value is now saved.
3. Set overrun time:
Press setting button [12] until the LED for
the overrun time you want lights up. Wait
until the LED flashes twice and goes out.
The value is now saved.
The settings take effect during the
next switch process (sensor, light
switch).
4. Fit designer cover [7] (
fold out page,
Fig. B).
8. Maintenance
The unit is maintenance-free.
Summary of Contents for ECA 100 ipro VZC
Page 3: ...A B C...