
VENTILATOREN
FR
EZQ.. B/D/E, DZQ.. B/D
EZS.. B/D/E, DZS.. B/D
DE
UK
2. Pierce the cable grommet [6] and lead the
power cable through the grommet into the
terminal compartment. Ensure correct ca
-
ble feed and tight grommet (IP 54/IP 55). If
necessary, seal the cable grommet on-site.
3. Electrically wire the fan to the terminal
block according to wiring diagram (
) (tightening torque of screws 0.7 Nm).
Check PE conductor connection (tightening
torque of screw 1.5 Nm).
CAUTION with EZQ../EZS.. and capacitor
not installed or incorrectly installed:
Motor
can start just by lightly touching the stationary
impeller
Risk of injury.