Maico Centro-M-APB Installation And Operating Instructions Manual Download Page 23

20 Wiring diagrams

23

Centro-H-APB

Exhaust air element with servomotor and humidity
control.
For use in systems with variable volumetric flow
for individual apartments.
Standard operation – basic ventilation, automatic
switchover to full load if required (switch-on/
switch-off point adjustable). Demand-based vent-
ilation can also be switched on by light switch.
Control of the volumetric air flows within the vent-
ilation system with Centro pressure controller.
Speed control of the central fan automatically.
Once the exhaust air element has been installed,
the unit regulates to the current room humidity
(relative humidity). This humidity value is saved
as the first reference value. The reference value
does not have to be specified manually.
If the room humidity rises by 7 % within 2
minutes, the exhaust air element switches to full
load operation (demand-based ventilation). If the
relative humidity falls below the reference value
during operation, the newly established reference
value is saved.

The exhaust air element then automatically
switches back to base load operation. Demand-
based ventilation automatically or via a switch (for
example light switch).
After manual switch-on (light switch) the exhaust
air element runs with a start delay of approx. 1
minute with demand-based ventilation (full load).
After manual switch-off, the exhaust air element
continues to run in nominal load operation with an
overrun time of 15 minutes (valve closing time ap-
prox. 2 - 3 minutes).

 When switch S1 is open, the exhaust air ele-

ment can start up automatically as a result of
high room humidity.

Summary of Contents for Centro-M-APB

Page 1: ...Installation and operating instructions Surface mounted system for centralised ventilation in ac cordance with DIN 18017 3 Centro M APB Centro E APB Centro H APB www maico ventilatoren com...

Page 2: ...preparations 9 8 1 Requirements in line with approval 9 8 1 1 Approval provisions 9 8 2 Permitted installation positions 9 8 3 Preparations for installation with fire protection requirements 10 8 3 1...

Page 3: ...3 Preface Please read the instructions carefully before in stalling and using for the first time Follow the in structions Pass these instructions on to the owner for safekeeping Overview of Centro APB...

Page 4: ...ci ated with electricity on the basis of your technical training and experience 3 Intended use Centro APB exhaust air elements are intended for use in central ventilation systems with a common main du...

Page 5: ...shock If the unit is open all off the supply circuits must be switched off mains fuse off secured against being accidentally switched back on and a visible warning sign must be attached Only operate t...

Page 6: ...mulate harmful substances mould germs etc This may also happen if the unit is shut down for an extended period If the air filter is missing the unit and air ducts become soiled Never operate the unit...

Page 7: ...y relative humidity This hu midity value is saved as the first reference value The reference value does not have to be spe cified manually If the room humidity rises by 7 within 2 minutes the exhaust...

Page 8: ...ch the air is to be extracted must be fitted with a non closable free supply air cross section of at least 150 cm e g with MLK door ventilation grille Centro E APB and Centro H APB with resist ance to...

Page 9: ...duct between the main duct in the shaft and the unit max 2 m long ap proval Duct elbows in the unit con nection duct Max 90 bend ascending Number of duct elbows permit ted for wall installation Max 1...

Page 10: ...DANGER Danger to life due to fire trans mission in case of faulty ceiling compound It is essential that the remaining gap between the main duct and the wall or ceiling is completely sealed with non fl...

Page 11: ...r bolt steel dowel 27 2 Metal expansion dowel 28 Retaining bolt with nut 29 Retaining bolt 30 Steel clamping band Keep a maximum distance of 1 5 m between the duct fastenings It is essential to observ...

Page 12: ...mmable materials that are resistant to de formation For example use concrete or ce ment mortar or for wall boards use fire protec tion filler 7 Fasten duct bends with 3 steel screws or 3 steel blind r...

Page 13: ...socket is incorrectly con nected to the connection duct Make the connection in accordance with these in structions and the general building approval 3 steel blind rivets are prescribed for the connec...

Page 14: ...It is es sential that the permissible installation posi tions are observed 3 Drill fixing holes and insert dowels Suitable mounting material is to be provided by the customer 4 Check ease of movement...

Page 15: ...r rectly all the way round 10 Slide connection duct up to stop above ex haust socket Connection between connection duct and exhaust socket must be leak tight use cold shrink tape for example Prescribe...

Page 16: ...of incorrect installation if non permitted mounting material is used Only secure connection duct to ceiling with per mitted mounting material duct clamp or clamping band Prescribed mounting material...

Page 17: ...ning sign DANGER Danger from electric shock The unit will be damaged if installed incorrectly with too long a power cable If the cable feed is too long inside the housing the fan insert cannot be inst...

Page 18: ...PB with fixed air volume setting for basic ventilation 8 Sealing 10 2 Shut off shutter 36 38 Locking tabs 37 Locking lever 2 Switch off mains fuse and fit warning sign 3 Check ease of movement of shut...

Page 19: ...n A all the way The red dye in the interior of the bar B is released The bar indicator first fills slightly Within the next 6 months the bar indicator B will rise to the upper edge indicator value 6 1...

Page 20: ...ocking tabs 37 Locking lever 38 Locking tabs 1 Switch off mains fuse secure and fit warning sign 2 Remove cover and upper part of housing 3 Press locking lever slightly to the left arrow I release and...

Page 21: ...o not connect addi tional consumers to ter minal 4 The unit may only be connected according to the wiring diagrams Wiring diagrams 22 If the fault persists or reoccurs Disconnect the unit completely f...

Page 22: ...estic waste Dispose of the packaging material in an environ mentally friendly way in compliance with the reg ulations valid in the country where you are Dispose of the air filter in an environmentally...

Page 23: ...erence value does not have to be specified manually If the room humidity rises by 7 within 2 minutes the exhaust air element switches to full load operation demand based ventilation If the relative hu...

Page 24: ...Maico Elektroapparate Fabrik GmbH Steinbeisstr 20 78056 Villingen Schwenningen Deutschland Service 49 7720 6940 info maico de D11 21_EN_DSW AV...

Reviews: